2025/2026
Bus Stop Construction
A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.

Please note: If your district is not listed, there is no construction planned for 2025/2026.
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
Hwy 7 Before Circle Dr (8918) | 3293 Hwy 7 | North side of Hwy 7 abutting Civic 3293 | Widen gravel shoulder, new asphalt pad | Completed October 2024 |
Hwy 7 Before Martin Lake Dr (8920) | 3103 Hwy 7 | West side of Hwy 7 abutting Civic 3103 | Widen gravel shoulder, new asphalt pad | Completed October 2024 |
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
Caldwell Rd After Birchill Dr (2218) | 1720 Birchill Dr | Northeast side of Caldwell Rd abutting Civic 1720 Birchill Dr | New concrete landing pad and sidewalk connection to Birchill Dr | Starting April 2025 |
Caldwell Rd After Cow Bay Rd (6333) | Opposite to 1804 Caldwell Rd | West side of Caldwell Rd near the cemetery | Upgrading shelter pad | Completed September 2024 |
Caldwell Rd After Himmelman Dr (6334) | 49 Sidney Cr | West side of Caldwell Rd after Himmelman Dr abutting Civic 49 Sidney Cr | Upgrading bus pad length | Completed September 2024 |
Caldwell Rd After Thorncrest Ct (6337) | 1881 Caldwell Rd | West side of Caldwell Rd near the elementary school | Upgrading shelter pad | Completed September 2024 |
Caldwell Rd Before Deyoung Dr (2220) | 1622 Caldwell Rd | Northeast side of Caldwell Rd abutting Civic 1622 | New concrete landing pad and sidewalk connection to Deyoung Dr | Starting April 2025 |
Caldwell Rd Before Seabreeze Dr (6340) | 1909 Caldwell Rd | Southwest side of Caldwell Rd near Ocean View Continuing Care Centre | Upgrading shelter pad | Completed September 2024 |
Caldwell Rd Opposite Kaleigh Dr (2219) | 1682 Caldwell Rd | Northeast side of Caldwell Rd abutting Civic 1682 | Concrete landing pad with sidewalk connection to Kaleigh Dr | Starting April 2025 |
Cow Bay Rd Before Caldwell Rd (8674) | 386 Cow Bay Rd | Northwest side of Cow Bay Rd abutting Civic 386 | Concrete landing pad and sidewalk connection to Caldwell Rd intersection | Starting April 2025 |
Heritage Hills Dr Before Cow Bay Rd (8673) | 4 Heritage Hills Dr | Northeast side of Heritage Hills Dr abutting Civic 4 | Concrete landing pad and sidewalk connection to Cow Bay Rd | Completed November 2024 |
Heritage Hills Dr Before Serop Cr (8672) | 1 Serop Cr | Northeast side of Heritage Hills Dr adjacent Civic 1 Serop Cr | Concrete landing pad and sidewalk connection to Serop Cr | Completed November 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Astral Dr After Brookfield Ave (6053) | 198 Astral Dr | East side of Astral Dr abutting Civic 198 | Replacement of existing concrete bus pad and sidewalk repairs | Pending construction 2025 |
Astral Dr At Civic 243 (2351) | 243 Astral Dr | West side of Astral Dr abutting Civic 243 | New bus stop replacing Astral Dr Before Stratford Dr (6051), installation of a concrete bus pad and sidewalk connecting to Astral Dr Elementary and Junior High driveway entrance | Pending construction 2025 |
Astral Dr Before Brookfield Ave (6054) | 197 Astral Dr | West side of Astral Dr abutting Civic 197 | Replacement of existing concrete bus pad with larger pad and installation of new concrete sidewalk connecting to Brookfield Ave intersection | Pending construction 2025 |
Astral Dr Before Grenadier Dr (2205) | Opposite of Civic 118 | West side of Astral Dr opposite to Civic 118 | Replacement of concrete bus pad and new concrete sidewalk connecting bus stop to Grenadier Dr intersection | Pending construction 2025 |
Astral Dr Before Grenadier Dr (6057) | 146 Astral Dr | East side of Astral Dr abutting Civic 146 | Replacement of existing concrete bus pad and sidewalk repairs | Pending construction 2025 |
Astral Dr Before Spence Dr (6059) | Opposite of 76 Astral Dr | South side of Astral Dr opposite to civic 76 | Relocation of the sign post | Pending construction 2025 |
Astral Dr Before Stratford Dr (6051) | 263 Astral Dr | West side of Astral Dr abutting Civic 263 | Removal of existing bus pad and post, reinstatement of sod, stop being replaced by new stop Astral Dr At Civic 243 (2351) located near Civic 243 | Pending construction 2025 |
Circassion Dr Before Ellerslie (6425) | 80 Circassion Cr | West side of Circassion Dr abutting Civic 80 | Concrete removal and sod reinstatement | Pending construction 2025 |
Forest Hills Pky After Cole Harbour Rd (6664) | 9 Forest Hills Pky | East side of Forest Hills Pky abutting Civic 9 | New shelter on the bus pad | Pending construction 2025 |
Hillsboro Dr After Karen Dr (6937) | 111 Hillsboro Dr | West side of Hillsboro Dr after Karen Dr | Removal of stop, consolidation of bus stops Hillsboro Dr After Karen Dr (6937) and Hillsboro Dr After Main St (6934) at Hillsboro Dr before Karen Dr (2331) | Constrution starting May 2025 |
Hillsboro Dr After Main St (6934) | PID 40948564 | West side of Hillsboro Dr before Karen Dr | Removal of stop, consolidation of bus stops Hillsboro Dr After Karen Dr (6937) and Hillsboro Dr After Main St (6934) at Hillsboro Dr before Karen Dr (2331) | Constrution starting May 2025 |
Hillsboro Dr Before Barbara Dr (6935) | PID 40948564 | East side of Hillsboro Dr before Barbara Dr | Replacement of existing concrete bus pad, curb, and sidewalk repairs | Constrution starting May 2025 |
Hillsboro Dr Before Karen Dr (2331) | PID 40948564 | West side of Hillsboro Dr before Karen Dr | New bus stop including installation of concrete bus pad, concrete layby and sidewalk connection to both Karen Dr and Barbara Dr intersection | Constrution starting May 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Alderney Dr Before Patuo'Qn (2359) | 11 Canal St | 40m Southwest from the new Alderney Dr/Patuo'Qn intersection near 11 Canal St | New stop, installation of concrete bus pad and sign post, installation new of multi-use path | Started April 2025 |
Bridge Terminal Bay 1 (7601) | 24 Nantucket Ave | North side of Bridge Terminal at Bay 1 within area where bus stops | Brick resetting on terminal platform | Pending 2025 construction |
Bridge Terminal Bay 2 (7602) | 24 Nantucket Ave | North side of Bridge Terminal at Bay 2 within area where bus stops | Brick resetting on terminal platform | Pending 2025 construction |
Bridge Terminal Bay 8 (7608) | 24 Nantucket Ave | North side of Bridge Terminal at Bay 8 within area where bus stops | Concrete bay repairs, brick resetting on terminal platform | Pending 2025 construction |
Bridge Terminal Bay 9 (7609) | 24 Nantucket Ave | South side of Bridge Terminal at Bay 9 within area where bus stops | Concrete bay repairs, brick resetting on terminal platform | Pending 2025 construction |
Bridge Terminal Bay 12 (7612) | 24 Nantucket Ave | South side of Bridge Terminal at Bay 12 within area where bus stops | Concrete bay repairs | Pending 2025 construction |
Bridge Terminal Bay 14 (7614) | 24 Nantucket Ave | South side of Bridge Terminal at Bay 14 within area where bus stops | Concrete bay repairs | Pending 2025 construction |
Bridge Terminal Bay 15 (7615) | 24 Nantucket Ave | South side of Bridge Terminal at Bay 15 within area where bus stops | Concrete bay repairs, brick resetting on terminal platform | Pending 2025 construction |
Bridge Terminal Bay 16 (7616) | 24 Nantucket Ave | South side of Bridge Terminal at Bay 16 within area where bus stops | Brick resetting on terminal platform | Pending 2025 construction |
Hudson Way Before Baffin Blvd (6083) | Near the intersection of Hudson Way and Baffin Blvd | West side of Hudson Way | Upgrading inaccessible bus stop to be accessible by installing new concrete bus pad with opposing pedestrian ramps, providing pedestrian access to the exisitng sidewalk on opposite side of Hudson Way | Construction starting May 2025 |
Pinecrest Dr After Albro Lake Rd (7449) | 44 Pinecrest Dr | North side of Pinecrest Dr | Slight relocation of bus stop approximately 5 metres west, replacement of concrete bus pad and new signpost | Pending 2025 construction |
Pinecrest Dr After Primrose St (2355) | 65 Primrose St | North side of Pinecrest Dr, abutting Civic 65 Primrose | New stop, installation of concrete bus pad and signpost | Pending 2025 construction |
Pinecrest Dr At Civic 103 (7452) | 103 Pinecrest Dr | East side of Pinecrest Dr at Civic 103 | Installation of a backless bench | Pending 2025 construction |
Pinecrest Dr At Civic 63 (7456) | 65 Pinecrest Dr | South side of Pinecrest Dr | Relocation of bus stop from 63 Pinecrest Dr to 65 Pinecrest Dr, new concrete bus pad and signpost | Pending 2025 construction |
Pinecrest Dr At Crystal Dr (7458) | 85 Pinecrest Dr | South side of Pinecrest Dr | Removal of stop | Pending 2025 construction |
Pinecrest Dr Before Albro Lake Rd (7450) | 169 Albro Lake Rd | South side of Pinecrest Dr, abutting Civic 169 Albro Lake Rd | Slight relocation of bus stop approximately 5 metres west, replacement of concrete bus pad and new signpost | Pending 2025 construction |
Pinecrest Dr Before Crystal Dr (7457) | 78 Pinecrest Dr | North side of Pinecrest Dr | Removal of stop, Pinecrest Dr Before Crystal Dr (7457) and Pinecrest Dr Before Primrose St (7459) will be consolidated at new location Pinecrest Dr After Primrose St (2355) | Pending 2025 construction |
Pinecrest Dr Before Primrose St (7459) | 72 Pinecrest Dr | North side of Pinecrest Dr | Removal of stop, Pinecrest Dr Before Crystal Dr (7457) and Pinecrest Dr Before Primrose St (7459) will be consolidated at new location Pinecrest Dr After Primrose St (2355) | Pending 2025 construction |
Primrose St Before Roberts Bruns Dr (2356) | 16 Primrose St | East side of Primrose St | New stop replacing Robert Burns Dr After Primrose St (8177), installation of new concrete bus pad between curb and sidewalk | Pending 2025 construction |
Princess Margaret Blvd After Windmill Rd (8075) | 463 Windmill Rd | North side of Princess Margaret Blvd abutting Civic 463 Windmill Rd | Installation of concrete bus pad, new abutting sidewalk connection from pad to the pedestrian ramp at the Windmill Rd intersection | Construction starting May 2025 |
Princess Margaret Blvd At Civic 40 (8071) | 40 Princess Margaret Blvd | West side of Princess Margaret Blvd adjacent to Civic 40 | Replacement of small asphalt pad with new standard size concrete bus pad between curb and walkway | Construction starting May 2025 |
Princess Margaret Blvd At Civic 55 (8072) | 55 Princess Margaret Blvd | West side of Princess Margaret Blvd adjacent to Civic 55 | Replacement of small concrete pad with new standard size concrete bus pad and pedestrian ramp to access opposite side of street, reinstallation of shelter | Construction starting May 2025 |
Princess Margaret Blvd Before Windmill Rd (8078) | 461 Windmill Rd | South side of Princess Margaret Blvd abutting Civic 461 Windmill Rd | Slight relocation of bus stop, new concrete bus pad between curb and sidewalk | Construction starting May 2025 |
Robert Burns Dr After Primrose St (8177) | 23 Primrose St | North side of Robert Burns Dr | Removal of stop, stop to be relocated to Primrose St Before Roberts Bruns Dr (2356) | Pending 2025 construction |
Thistle St After Beech St (8383) | 74 Thistle St | Southeast side of Thistle St abutting Civic 74 | Concrete bus pad replacement | Construction starting May 2025 |
Thistle St After Crichton Park Rd (8384) | 2 Forest Rd | North side of Thistle St near 2 Forest Rd | Replacement of existing concrete bus pad and sidewalk repairs | Construction starting May 2025 |
Thistle St After Mayflower St (8386) | 98 Thistle St | East side of Thistle St abutting Civic 98 | Additional concrete at stop to increase bus pad length | Construction starting May 2025 |
Thistle St Before Crichton Park Rd (8391) | 3 Crichton Park Rd | West side of Crichton Park Rd near Civic 3 | Replacement of existing concrete bus pad and sidewalk repairs | Construction starting May 2025 |
Thistle St Before Mayflower St (8388) | 97 Thistle St | West side of Thistle St abutting Civic 97 | Replacement of existing concrete bus pad with a larger concrete pad | Construction starting May 2025 |
Thistle St opposite Beech St (8390) | Opposite to 28 Beech St | North side of the Thistle St opposite to 28 Beech St | Slight relocation of the stop to allow installation of a pedestrian ramp to cross to the sidewalk on opposite side of the road and installation of new standard concrete bus pad approximately 12 metres north of current location | Construction starting May 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Albro Lake Rd Before Chapman St (6020) | 81 Albro Lake Rd | North side of Albro Lake Rd adjacent Civic 85 | Slight relocation, sidewalk repairs, new concrete pad between curb and sidewalk | Pending 2025 construction |
Gregory Dr Before Wildwood Blvd (6794) | Opposite to 14 Gregory Dr | North side of Gregory Dr opposite to Civic 14 | New bench in bus shelter | Completed March 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Barrington St After Cogswell St Bay 3 (6105) | 1990 Barrington St | East side of Barrington St | Concrete bus pad, sidewalk replacement, new bus shelters | Construction started June 2024 |
Barrington St After Duke St Bay 1 (6087) | 1903 Barrington St | West side of Barrington St | Concrete bus pad, sidewalk replacement, new bus shelters | Construction started June 2024 |
Barrington St At Scotia Square Bay 4 (6108) | 1930 Barrington St | East side of Barrington St | Concrete bus pad, sidewalk replacement, new bus shelters | Construction started June 2024 |
Barrington St Before Cogswell Bay 2 (2348) | 1903 Barrington St | West side of Barrington St | Concrete bus pad, sidewalk replacement, new bus shelters | Construction started June 2024 |
Barrington St Before Duke St Bay 5 (6107) | 5201 Duke St | East side of Barrington St | Concrete bus pad, sidewalk replacement, new bus shelters | Construction started June 2024 |
Bell Rd After Robie St (6291) | 1840 Bell Rd | South side of Bell Rd | Slight relocation of bus stop and concrete bus pad extension | Construction started July 2024 |
Inglis St At SMU (6965) | 5932 Inglis St | South side of Inglis St near SMU | Extension of concrete bus pad and shelter pad | Construction started September 2024 |
Inglis St Before Robie St (2322) | 5985 Inglis St | North side of Inglis St near the playground | New bus stop on bumpout, concrete landing pad with tactile directional plates and braille and raised text signage, bus shelter installation | Completed November 2024 |
Inglis St Before Robie St (6966) | Inglis St Elementary School | North side of Inglis St near the elementary school | Removal of stop and concrete pad, consolidation of stops Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) and relocation at the location of work | Stop is permanently closed |
Inglis St Opposite SMU (6960) | 5915 Inglis St | North side of Inglis St near Civic 5915 | Removal of stop and concrete pad, consolidation of stops Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) | Stop is permanently closed |
Robie St Opposite Binney St (8219) | 1600 Summer St | East side of Robie Street near the cemetery | Slight relocation, new concrete pad between curb and sidewalk | Construction completed October 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Barrington St After Nora Bernard St (6125) | 2170 Barrington St | West side of Barrington St | Removal of stop due to reconfiguration of Barrington St | Completed October 2024 |
Barrington St After Roundabout (2344) | 2242 Barrington St | East side of Barrington St | New stop, new concrete pad | Completed November 2024 |
Barrington St After Upper Water St (2347) | 2089 Upper Water St | North side of street | New stop, new concrete pad | Completed December 2024 |
Barrington St Before Nora Bernard St (6104) | 5221 Barrington St | West side of Barrington St | Relocation of stop, new concrete bus pad | Construction started October 2024 |
Barrington St Before Roundabout (2345) | 2202 Upper Water St | East side of Upper Water St | New stop, new concrete pad | Completed October 2024 |
Barrington St Before Upper Water St (2346) | 2021 Brunswick St | West side of Barrington St | New stop, new concrete pad | Construction started October 2024 |
Duffus St After Novalea Dr (6583) | 5521/5515 Duffus St | North side of Duffus St abutting Civic 5521/5515 | Shelter replacement | Completed October 2024 |
Quinpool Rd Before Windsor St (8261) | 6067 Quinpool Rd | North side of Quinpool Rd adjacent to the playground | Installation of larger shelter | Completed July 2024 |
Robie St Before Cabot St (8203) | 3468 Robie St | Southwest side of Robie St abutting Civic 3468 | Shelter replacement | Completed October 2024 |
Windsor St After Connaught Ave (8551) | 3628 Windsor St | South side of Windsor St abutting Civic 3628 | Concrete pad extension | Completed December 2024 |
Windsor St Before Maxwell Ave (8565) | 3380 Windsor St | South side of Windsor St abutting Civic 3380 | Slight relocation, new concrete pad between curb and sidewalk | Completed December 2024 |
Windsor St Opposite London St (8572) | 2901 Windsor St | Northeast side of Windsor St abutting Civic 2901 | Shelter replacement | Completed October 2024 |
Young St After Monaghan Dr (8629) | 6141 Young St | Northwest side of Young St abutting Civic 6141 | Shelter replacement | Completed July 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Joseph Howe Dr After Scot St (2325) | 3601 Joseph Howe Dr | East side of Joseph Howe Dr near the Superstore | New concrete pad between curb and sidewalk, new shelter pad and shelter behind the sidewalk | Pending 2025 construction |
Joseph Howe Dr Before Abbott Dr (6979) | Opposite and North of 7165 Abbott Dr | West side of Joseph Howe Dr south of Hwy 102 overpass | New concrete shelter pad and shelter behind sidewalk | Completed March 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Dutch Village Rd After Andrew St (2###) | 3569 Dutch Village Rd | East side of Dutch Village Rd | New bus stop replacing Dutch Village Rd Before Rosedale Ave (6613) and Dutch Village Rd Before Sunnybrae Ave (6638), installation of concrete bus pad, new sign post, installation of tactile warning indicator plates adjacent to bike lane and sidewalk | Pending construction 2025 |
Dutch Village Rd Before Andrew St (6609) | 3543 Dutch Village Rd | East side of Dutch Village Rd | Removal of stop, stop being replaced by Dutch Village Rd After Andrew St (2###) | Pending construction 2025 |
Dutch Village Rd Before Central Ave (2###) | 3464 Dutch Village Rd | West side of Dutch Village Rd | New bus stop replacing Dutch Village Rd Before Andrew St (6609), installation of concrete bus pad, new sign post, installation of tactile warning indicator plates adjacent to bike lane and sidewalk | Pending construction 2025 |
Dutch Village Rd Before Central Ave (6788) | 3425 Dutch Village Rd | East side of Dutch Village Rd | Slight relocation, replacement of concrete bus pad, new sign post, installation of tactile warning indicator plates adjacent to bike lane and sidewalk | Pending construction 2025 |
Dutch Village Rd Before Rosedale Ave (6613) | 3534 Dutch Village Rd | West side of Dutch Village Rd | Removal of stop, stop being replaced by Dutch Village Rd Before Central Ave (2###) | Pending construction 2025 |
Dutch Village Rd Before Rufus Ave (6614) | 3600 Dutch Village Rd | West side of Dutch Village Rd | Replacement of concrete bus pad, new sign post, installation of tactile warning indicator plates adjacent to bike lane and sidewalk | Pending construction 2025 |
Dutch Village Rd Before Sunnybrae Ave (6638) | 3422 Dutch Village Rd | West side of Dutch Village Rd | Removal of stop, stop being replaced by Dutch Village Rd Before Central Ave (2###) | Starting April 2025 |
Kearney Lake Rd After Hamshaw Dr (7021) | 209 Kearney Lake Rd | North of Kearney Lake Rd | Slight relocation with new bus pad | Pending construction 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Greystone Dr After Cobalt Walk (6798) | 160 Lavender Walk | At the cul-de-sac of the Greystone Dr near Civic 160 Lavender Walk | New concrete pad between curb and sidewalk | Completed August 2024 |
Purcells Cove Rd After Dingle Rd (8118) | 1452 Purcells Cove Rd | East side of Purcells Cove Rd abutting Civic 1452 | Shelter replacement | Completed August 2024 |
Purcells Cove Rd After Sailboat Ln (8122) | Opposite 1255 Purcells Cove Rd | North side of Purcells Cove Rd near Reserve Rd | Shelter replacement | Completed September 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Chain Lake Dr At Civic 209 (6394) | 209 Chain Lake Dr | West side of Chain Lake Dr abutting Civic 209 | Concrete pad extension | Completed October 2024 |
Julius Blvd Before Dugger McNeil Dr (2315) | 125 Julius Blvd | South side of Julius Blvd adjacent Civic 125 | New bus stop, new concrete pad between curb and sidewalk | Completed October 2024 |
Julius Blvd Before Dugger McNeil Dr (2317) | 82 Julius Blvd | North side of Julius Blvd adjacent Civic 85 | New bus stop, new concrete pad between curb and multi-use path | Completed October 2024 |
Maplewood Dr Before St Margarets Bay Rd (7180) | 10 Maplewood Dr | South side of Maplewood Dr after the trail | Slight relocation of bus stop with new concrete pad | Completed December 2024 |
St Margarets Bay Rd After Clearwater Dr (6175) | 1 Devonshire Dr | North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd Intersection | New concrete pad and pedestrian ramp to intersection | Completed October 2024 |
St Margarets Bay Rd After Raines Mill Rd (2328) | 2 Raines Mill Rd | North side of St Margarets Bay Rd abutting 2 Raines Mill Rd | New bus stop with new concrete pad between curb and sidewalk, replacing bus stop St Margarets Bay Rd Before Raines Mill Rd (6180) | Completed January 2025 |
St Margarets Bay Rd at civic 1917 (2330) | 1917 St Margarets Bay Rd | North side of St Margarets Bay Rd abutting Civic 1917 | New bus stop with new concrete pad between the curb and the sidewalk, replacing bus stop St Margarets Bay Rd At Civic 1939 (6149) | Starting May 2025 |
St Margarets Bay Rd At Civic 1939 (6149) | 1939 St Margarets Bay Rd | North side of St Margarets Bay Rd near Civic 1917 | Removal of bus stop, new location of bus stop to further east side of St Margarets Bay Rd at Civic 1917 (2330) | Stop is permanently closed |
St Margarets Bay Rd Before Raines Mill Rd (6180) | 1403 Lakeside Dr | North side of St Margarets Bay Rd near Civic 1403 Lakeside Dr | Removal of bus stop, new location of bus stop at St Margarets Bay Rd After Raines Mill Rd (2328) | Stop is permanently closed |
St Margarets Bay Rd Before Sheppards Run (6157) | 438 Sheppards Run | South side of St Margarets Bay Rd adjacent 438 Sheppards Run | Shelter replacement | Completed October 2024 |
St Margarets Bay Rd Opposite Boylan Ln (6164) | 1370 St Margarets Bay Rd | South side of St Margarets Bay Rd abutting Civic 1370 | New concrete bus pad and new sidewalk from Raines Mill Rd to Oliver St, connecting shelter pad to an accessible pedestrian route | Completed January 2025 |
Susie Lake Cr Before Julius Blvd (2313) | 420 Susie Lake Cr | North side of Susie Lake Cr opposite Civic 420 | New concrete pad between curb and sidewalk, concrete shelter pad, and shelter | Completed March 2024 |
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
2353 Prospect Bay Rd Before Carpool Parking Lot (2353) | No abutting civic address | North side of Prospect Rd before the carpool parking lot | New bus stop created, installation of signpost | Pending 2025 construction, stop will be active for use May 19, 2025 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Beaver Bank Rd After Welkin Dr (8755) | 352 Beaver Bank Rd | West side of Beaver Bank Rd opposite Civic 345 | New signpost, concrete pad, and sidewalk connection to intersection at Welkin Dr | Completed 2024 |
Beaver Bank Rd Before Welkin Dr (8713) | 343 Beaver Bank Rd | East side of Beaver Bank Rd near Civic 343 | Relocation bus stop forward ~10m, concrete pad increase, installation of signpost | Completed May 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Cobequid Rd After Freer Ln (6434) | 191 Cobequid Rd | East side of Cobequid Rd near Civic 191 | New shelter pad | Completed December 2023 |
Cobequid Rd After Maple Grove Dr (6431) | 450 Cobequid Rd | West side of Cobequid Rd near Civic 450 | New shelter pad | Completed December 2024 |
Cobequid Rd Before Maple Grove Dr (6441) | 473 Cobequid Rd | East side of Cobequid Rd near Civic 477 | Relocation of the stop to Civic 477, stop will be closed permanently from February | Completed December 2024 |
Cobequid Rd After Maple Grove Dr (2349) | 477 Cobequid Rd | East side of Cobequid Rd near Civic 477 | New bus stop with new concrete pad and connection to new concrete sidewalk, replacing bus stop Cobequid Rd Before Maple Grove Dr (6441) | Completed December 2024 |
First Lake Dr After Civic 192 (6683) | 192 First Lake Dr | North side of First Lake Dr near Civic 192 | New sidewalk connection to the concrete pad | Completed July 2024 |
Sackville Dr Before Armoyan Dr (7313) | 300 Sackville Dr | West side of Sackville Dr abutting Civic 300 | Shelter replacement | Completed October 2024 |
Sackville Terminal Bay 4 (8960) | Sackville Terminal | Sackville Terminal | Shelter replacement | Completed October 2024 |
Stokil Dr After Grennan Dr (8354) | 86 Grennan Dr | West side of Stokil Dr near Civic 86 Grennan Dr | Concrete pad replacement | Completed September 2024 |
Stokil Dr After Grennan Dr (8356) | 253 Stokil Dr | East side of Stokil Dr near Civic 1 Armcrest Dr | Slight relocation to Civic 1 Armcrest Dr, new concrete pad between curb and sidewalk | Completed September 2024 |
Stokil Dr After Sampson Dr (8355) | 2 Sampson Dr | North side of Stokil Dr near Civic 2 Sampson Dr | Concrete pad replacement | Completed September 2024 |
Stokil Dr Before Smokey Dr (8358) | 241 Smokey Dr | West side of Stokil Dr adjacent to elementary school | Concrete pad replacement | Completed September 2024 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Bedford Hwy After Charlotte Ln (6287) | 587 Bedford Hwy | East side of Bedford Hwy near Civic 587 | Installation of new concrete curb and gutter, concrete bus pad, shelter with concrete shelter pad, and sidewalk to connect bus stop to Charlotte Ln intersection | Construction starting May 2025 |
Bedford Hwy After Shaunslieve Dr (6234) | 34 Shaunslieve Dr | West side of Bedford Hwy near Civic 34 Shaunslieve Dr | Replacement of existing concrete bus pad, sidewalk replacement to connect bus stop to Shaunslieve Dr intersection, and new shelter pad and shelter | Construction starting May 2025 |
Southgate Dr Before McQuillan Ln (2358) | 120 Southgate Dr | East side of Southgate abutting Civic 120 | New bus stop, installation of concrete bus pad between curb and sidewalk | Pending 2025 construction |
West Bedford Park & Ride | 120 Innovation Dr | East side of Innovation Dr near parking lot of Civic 120 | New shelter installation | Pending 2025 construction |