Bus Stop Construction

2022/2023 Bus Stop Construction 

A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.


* = No construction planned for 2022/2023.

 

*District 1 - Waverley - Fall River - Musquodoboit Valley

District 2 - Preston - Chezzetcook - Eastern Shore

District 3 - Dartmouth South - Eastern Passage

District 4 - Cole Harbour - Westphal - Lake Loon - Cherry Brook

District 5 - Dartmouth Centre

District 6 - Harbourview - Burnside - Dartmouth East

District 7 - Halifax South Downtown

District 8 - Halifax Peninsula North

District 9 - Halifax West Armdale

District 10 - Halifax - Bedford Basin West

District 11 - Spryfield - Sambro Loop - Prospect Road

District 12 - Timberlea - Beechville - Clayton Park - Wedgewood

*District 13 - Hammonds Plains - St. Margarets

District 14 - Middle/Upper Sackville - Beaver Bank - Lucasville

District 15 - Lower Sackville

District 16 - Bedford - Wentworth

Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Cain St After Churchill Terr (6331) 15 Cain St and 2 Churchiill Terr Northeast side of Cain St from Civic 15 to intersection of Churchill Terr New bus stop pad and sidewalk Pending 2023 construction
Clarence St After Cain St (8506) 34 Clarence St Northwest side of Clarence St from Civic 34 to the intersection of Cain St New bus stop pad and sidewalk Pending 2023 construction
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Cranberry Cr At Civic 100 (6524) 100 & 102 Cranberry Cres West side of Cranberry Cres adjacent to Civic 102 Replace unused curb cut with new concrete pad and curb to match existing Pending 2023 construction
Cranberry Cr After Valkyrie Cr (6521) 126, 128 & 130, 132, and 134 Cranberry Cres South side of Cranberry Cr in front of Civic 128 to the asphalt walkway adjacent to Civic 130 New sidewalk Complete
Plaza Dr After Topsail Blvd (2264) 4 Plaza Dr North side of Plaza Dr adjacent to 4 Plaza Dr to the intersection of Topsail Blvd New bus pad and sidewalk Complete
Windward Ave After Lea St (8575) 34 Windward Ave Southwest side of Windward Ave adjacent to side yard of 4 Lea St to the intersection of Lea St New bus pad and sidewalk Complete
Windward Ave Before Lucien Dr (8576) 42 and 42A Lucien Dr Southeast side of Windward Ave across from Civic 39 adjacent to 42 Lucien Dr to the intersection of Lucien Dr New sidewalk Complete
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Karen Dr After Hillsboro Dr (7012) 19 Karen Dr North side Karen Dr abutting Civic 19 Discontinued stop - Remove concrete and post, reinstate sod Pending 2023 Construction
Pearl Dr Before Amethyst Cr (6061) 1 Amethyst Cres West side of Pearl Dr across from Civic 9 Discontinued stop - Remove concrete, reinstate sod Pending 2023 Construction
Sherwood St Opposite Woodbury Dr (8268) 70 Woodbury Dr South side of Sherwood St at Woodbury Dr and Sherwood St intersection Discontinued stop - Remove concrete, reinstate sod Pending 2023 Construction
Taranaki Dr After Greely Ct (8376) 238 Taranaki Dr East side of Taranaki Dr abutting Civic 238 Discontinued stop - Remove concrete and post, reinstate sod Pending 2023 Construction
Taranaki Dr After Karen Dr (8375) 171 Taranaki Dr North side of Taranaki Dr abutting Civic 171 Discontinued stop - Remove concrete and post, reinstate sod Pending 2023 Construction
Taranaki Dr At Civic 194 (8379) 194 Taranaki Dr East side of Taranaki Dr abutting Civic 194 Discontinued stop - Remove concrete and post, reinstate sod Pending 2023 Construction
Taranaki Dr Before Forest Hills Pky (8378) 289 Taranaki Dr North side of Taranaki Dr abutting Civic 289 Discontinued stop - Remove concrete and post, reinstate sod Pending 2023 Construction
Taranaki Dr Before Greely Ct (8377) 251 Taranaki Dr East side of Taranaki Dr abutting Civic 251 Discontinued stop - Remove concrete, reinstate sod Pending 2023 Construction
Circassion Dr After Ellerslie Cr (6425) 62 Circassion Cr East side of Circassion Dr abutting Civic 80 Relocation of bus stop to after Ellerslie Cres, concrete pad between curb and sidewalk Pending 2023 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Windmill Rd Before Wyse Rd (7196) 53 Windmill Rd South side of Windmill Rd adjacent to Civic 55 Relocation of bus stop outside of driveway. Concrete pad between curb and sidewalk. Pending 2023 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Windmill Rd After Civic 520 (8535) 520 Windmill Rd West side of Windmill rd across Civic 520 Install new concrete pad with ped ramp Pending 2023 construction
Belle Vista Dr After Woodlawn Rd (6292) 143 Belle Vista Dr, 75 woodlawn Rd South side of Belle Vista Dr adjacent to side yard of 75 Woodlawn Rd New sidewalk Complete
Spikenard St Before Louisburg Ln (8323) 74 Spikenard St South side of Spikenard St across from Civic 75 Bus pad adjustments, new sidewalk Complete
Spikenard St After Farquharson St (8320) 88 and 90 Spikenard St South side of Spikenard St in front of Civic 90 New bus pad, new sidewalk Complete
Lexington Ave At Walnut Hall (7146) 118 Lexington Ave, 75 Walnut Hall North side of Lexington Ave in front of Civic 118, continue sidewalk around corner along side yard New sidewalk Complete
Ellenvale Ave Before Spring Ave (6636) 75 Ellenvale Ave South side of Ellenvale Ave in front of Civic 75 New bus pad, new sidewalk Complete
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Lower Water St Before Sackville St (8821) 1601 Lower Water St East Side of Lower Water Street abutting Civic 1601 Install new concrete pad between curb and sidewalk, relocate planter to area just past bus stop (north) Pending 2023 Construction
Hollis St After Barrington St (6938) 1145 Barrington St South side of Hollis St abutting 1145 Barrington St New bus pad with tactile indicators Pending 2023 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
St Pauls St Before Vestry St (8350) 3594 St Pauls St Southwest side of St Pauls St across Civic 3605 Discontinued stop - remove shelter pad behind sidewalk, reinstate sod Pending 2023 Construction
Kencrest Ave Before Glebe St (7050) 3749 Kencrest Ave South side of Kencrest Ave across Civic 3749 Remove existing shelter pad replace existing concrete pad behind sidewalk. Shelter to be temporarily removed. Pending 2023 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Kelly St After Halef Ct 2 Halef Ct East side of Kelly st between Alton Dr and Halef Ct New stop location, new concrete pad between curb and sidewalk Pending 2023 Construction
Cowie Hill Rd Before Margate Dr (6514) 1 Margaret Rd, Halifax North side of Cowie Hill Rd in front of 41 Cowie Hill Rd New bus pad, new sidewalk Complete
Tamarack Dr Opposite Medina Ct (8372) Stanley Park - 56 Tamarack Dr, Halifax Southwest side of Tamarack Dr in front of Stanley Park parking lot Bus stop relocation, new bus pad, new sidewalk Pending 2023 construction
Tamarack Dr Before Mountain Rd (8373) 10 Tamarack Dr, Halifax Southwest side of Tamarack Dr between Civic 10 & 32 New sidewalk Complete
Highfield St Before Punch Bowl Dr (6916) 5 Punch Bowl Dr, Halifax South side of Highfield St adjacent to side yard of 5 Punch Bowl Dr New bus pad, new sidewalk Complete
Osborne St At Civic 7 (7397) 207 Osborne St, Halifax Northwest side of Osborne St in front of Civic 207 New bus pad, new sidewalk Complete
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Willett St Before Frederick Ave (8500) 123 Rosedale Ave, Halifax East side of Willett St adjacent to side yard of 123 Rosedale Ave Stop to be decommissioned 2022. Stop decommissioned. Shelter removal complete.Pad removal pending 2023 construction
Willett St Before Adelaide Ave (8498) 104 Adelaide Ave, Halifax East side of Willett St adjacent to 104 Adelaide Ave Stop to be decommissioned 2022. Stop decommissioned. Shelter removal complete.Pad removal pending 2023 construction
Willett St After Frederick Ave - East side of Willett St, adjacent to SE Corner of WD Piercey Sportfield Park A new stop will be created, including new bus pad, shelter, and sidewalk connecting to the marked crosswalk at Frederick Ave. Complete
Larry Uteck Before Amesbury Gate (6027) Amesbury Gate Community Park West side of Larry Uteck near Kearney Lake New bus pad, new sidewalk Complete
Flamingo Dr After Nightingale Dr (6698) 2 Nightingale Dr East side of Flamingo Dr abutting 2 Nightingale Dr New bus pad, new sidewalk Pending 2023 construction
Flamingo Dr After Meadowlark Cr (6706) DJ Butler Park North side of Flamingo Dr abutting DJ Butler Park New bus pad, new sidewalk Pending 2023 construction
Flamingo Dr Before Dove St (6701) 57 Flamingo Dr West side of Flamingo Dr abutting Civic 57 Permenant relocation (to Flamingo Dr After Dove St (xxxx)). Remove concrete, reinstate sod. Pending 2023 construction
Flamingo Dr After Dove St (2303) 61 Flamingo Dr West side of Flamingo Dr abutting Civic 61 New bus pad, new sidewalk Pending 2023 construction
Flamingo Dr Before Meadowlark Cr (6702) 96 Flamingo Dr South side of Flamingo Dr abutting Civic 96 New bus pad, slight relocation. Remove old concrete and reinstate sod. Pending 2023 construction
Flamingo Dr After Nightingale Dr (6699) 110 Flamingo Dr Southwest side of Flamingo Dr abutting Civic 110 Permenant relocation (to Flamingo Dr After Dipper Cres (xxxx)). Remove concrete, reinstate sod. Pending 2023 construction
Flamingo Dr After Dipper Cres (2302) 114 and 116 Flamingo Dr Southwest side of Flamingo Dr abutting Civic 114/116 New bus pad Pending 2023 construction
Main Ave After Hillcrest St (7164) 176 Main Ave South side of Main Ave abutting civic 176 Permenant relocation (to Main Ave Before Hillcrest Ave (xxxx)). Remove concrete, reinstate sod. Pending 2023 construction
Main Ave Before Borden St (7168) 17 Skeena St and 18 Borden St South side of Main Ave between 17 Skeena St and 18 Borden St Extend bus pad Pending 2023 construction
Main Ave Before Hillcrest St (2301) 50 Hillcrest St South side of Main Ave abutting 50 Hillcrest St New bus pad, new sidewalk, new shelter Pending 2023 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Old Sambro Rd At Civic 143 (7392) 143 Old Sambro Rd West side of Old Sambro Rd abutting Civic 143 Relocation of bus stop outside of driveway past the utility pole. Pending 2023 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Chain Lake Dr At Civic 209 (6394) 209 Chain Lake Dr West Side of Chain Lake Dr abutting Civic 209 Extend existing pad for rear door Pending 2023 construction
St Margarets Bay Rd After Clearwater Dr (6175) 1 Devonshire Dr North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd Intersection New concrete pad Pending 2023 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Beaver Bank Rd before Kinsac Rd (2123) 1581 BeaverBank Rd West side of Beaver Bank Rd before Kinsac Rd Extend existing asphalt pad forward Pending 2023 construction
Millwood Dr After Rafting Dr (7237) 141 Millwood Dr South side of Millwood Dr after Rafting Dr New concrete pad, slight relocation away from intersection Complete
Millwood Dr Before Jackladder Dr (2111) 155 Millwood Dr South side of Millwood Dr across from Civic 160 New concrete pad Complete
Millwood Dr Before Beaver Bank Cross Rd (7228) 294 Beaver Bank Cross Rd South side of Millwood Dr abutting Millwood Common Park New concrete pad, slight relocation away from intersection Complete
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Sackville Dr At Civic 614 (7309) 614 Sackville Dr Southwest Side of Sackville Dr abutting Civic 614 Discontinued stop - remove concrete, reinstate sod Pending 2023 construction
Cobequid Rd Before Glendale Dr (6438) 220 Cobequid Rd North side of Cobequid Rd abutting Civic 220 New concrete pad between curb and sidewalk and new post Pending 2023 construction
Old Sackville Rd After Madeline Ave (2041) 455 Old Sackville Rd North side of Old Sackville Rd abutting Civic 455 Repair gravel washout under existing concrete pad Pending 2023 construction
Old Sackville Rd Before Walker Ave (2043) 599 Old Sackville Rd Northeast side of Old Sackville Rd abutting Civic 589 Requires asphalt to prevent wash out Pending 2023 construction
Sackville Dr At Civic 622 (2275) 622 Sackville Dr Southwest Side of Sackville Dr abutting Civic 622 New concrete pad between curb and sidewalk Pending 2023 construction
First Lake Dr Opposite Cabot Cr (6685) 329 First Lake Dr, Lower Sackville West side of First Lake Dr, relocating to Civic 329 New bus pad, new sidewalk Complete
Nappan Dr Before Newcombe Dr (7288) 70 Nappan Dr, Lower Sackville East side of Nappan Dr in front of Civic 70 New bus pad, new sidewalk Complete
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Basinview Dr After Roy Cr (6142) 221 Basinview Dr East Side of Basinview Dr after Roy Crescent and Basinview Dr Intersection Relocation of bus stop outside of T-intersection. New concrete pad between curb and sidewalk. Pending 2023 construction
Basinview Dr after Church Ct (xxxx) 316 Basinview Dr, Bedford South side of Basinview Dr abutting Civic 216 New concrete pad and sidewalk connection to crosswalk at intersection of Basinview Dr and Church ct . Pending 2023 construction
Basinview Dr After Glen Moir Terr (6130) 66, 70 & 72 Basinview Dr, Bedford Northwest side of Basinview Dr abutting Civic 70 Bus pad adjustments, new sidewalk Pending 2023 construction
Basinview Dr After Meadowbrook Dr (6133) 548 Basinview Dr, Bedford West side of Basinview Dr abutting Civic 548 Bus pad adjustments, new sidewalk Pending 2023 construction
Basinview Dr At Civic 142 (6135) 142 & 144 Basinview Dr, Bedford West side of Basinview Dr abutting Civic 142 Bus pad adjustments, new sidewalk Pending 2023 construction
Basinview Dr Before Carriageway Ct (6134) 5 Carriageway Ct North side of Basinview Dr between Atlee Crt and Church Crt New concrete pad between curb and sidewalk Pending 2023 construction
Basinview Dr Before Granville Rd (6137) 1 Granville Rd, Bedford West side of Basinview Dr across from 417 Basinview Bus pad adjustments, new sidewalk Pending 2023 construction
Basinview Dr Opposite Granville Rd (6141) 411 Basinview Dr East side of Basinview Dr abutting Civic 411 Relocation of bus stop outside of T-intersection. New concrete pad between curb and sidewalk Pending 2023 construction