Bus Stop Construction

A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.

Construction Notice

Please note: If your district is not listed, there is no construction planned for 2025/2026.

Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Baker Dr After Lindenwood Terr (9066) 144 Baker Dr West side of Baker Dr near Civic 144 Relocation of bus stop approximately 7m to the south to accommodate a new crosswalk, installation of concrete bus pad between the existing sidewalk and curb Pending 2025 Construction
Caldwell Rd After Birchill Dr (2218) 1720 Birchill Dr Northeast side of Caldwell Rd abutting Civic 1720 Birchill Dr Installation of new concrete bus pad and installation of sidewalk connection to Birchill Dr Starting May 2025
Caldwell Rd Before Deyoung Dr (2220) 1622 Caldwell Rd Northeast side of Caldwell Rd abutting Civic 1622 Installation of new concrete bus pad and installation of sidewalk connection to Deyoung Dr Starting May 2025
Caldwell Rd Opposite Kaleigh Dr (2219) 1682 Caldwell Rd Northeast side of Caldwell Rd abutting Civic 1682 Installation of new concrete bus pad and installation of sidewalk connection to Kaleigh Dr Starting May 2025
Cow Bay Rd Before Caldwell Rd (8674) 386 Cow Bay Rd Northwest side of Cow Bay Rd abutting Civic 386 Installation of new concrete bus pad and installation of sidewalk connection to Caldwell Rd intersection Starting May 2025
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Astral Dr After Brookfield Ave (6053) 198 Astral Dr East side of Astral Dr abutting Civic 198 Replacement of existing concrete bus pad and sidewalk repairs Construction starting May 2025
Astral Dr At Civic 243 (2351) 243 Astral Dr West side of Astral Dr abutting Civic 243 New bus stop replacing Astral Dr Before Stratford Dr (6051), installation of a concrete bus pad and sidewalk connecting to Astral Dr Elementary and Junior High driveway entrance Construction starting May 2025
Astral Dr Before Brookfield Ave (6054) 197 Astral Dr West side of Astral Dr abutting Civic 197 Replacement of existing concrete bus pad with larger pad, installation of new concrete sidewalk connecting to Brookfield Ave intersection Construction starting May 2025
Astral Dr Before Grenadier Dr (2205) Opposite of Civic 118 West side of Astral Dr opposite to Civic 118 Replacement of concrete bus pad and new concrete sidewalk connecting bus stop to Grenadier Dr intersection Construction starting May 2025
Astral Dr Before Grenadier Dr (6057) 146 Astral Dr East side of Astral Dr abutting Civic 146 Replacement of existing concrete bus pad and sidewalk repairs Construction starting May 2025
Astral Dr Before Spence Dr (6059) Opposite of 76 Astral Dr South side of Astral Dr opposite to Civic 76 Relocation of the sign post Construction starting May 2025
Astral Dr Before Stratford Dr (6051) 263 Astral Dr West side of Astral Dr abutting Civic 263 Removal of existing bus pad and post, reinstatement of sod, stop being replaced by new stop Astral Dr At Civic 243 (2351) Construction starting May 2025
Circassion Dr Before Ellerslie (6425) 80 Circassion Cr West side of Circassion Dr abutting Civic 80 Concrete removal and sod reinstatement Pending construction 2025
Forest Hills Pky After Cole Harbour Rd (6664) 9 Forest Hills Pky East side of Forest Hills Pky abutting Civic 9 Installation of new shelter on the bus pad Pending construction 2025
Hillsboro Dr After Karen Dr (6937) 111 Hillsboro Dr West side of Hillsboro Dr after Karen Dr Removal of stop, consolidation of bus stops Hillsboro Dr After Karen Dr (6937) and Hillsboro Dr After Main St (6934) at Hillsboro Dr before Karen Dr (2331) Construction starting May 2025
Hillsboro Dr After Main St (6934) PID 40948564 West side of Hillsboro Dr before Karen Dr Removal of stop, consolidation of bus stops Hillsboro Dr After Karen Dr (6937) and Hillsboro Dr After Main St (6934) at Hillsboro Dr before Karen Dr (2331) Construction starting May 2025
Hillsboro Dr Before Barbara Dr (6935) PID 40948564 East side of Hillsboro Dr before Barbara Dr Replacement of existing concrete bus pad, curb and sidewalk repairs Construction starting May 2025
Hillsboro Dr Before Karen Dr (2331) PID 40948564 West side of Hillsboro Dr before Karen Dr New bus stop including installation of concrete bus pad, concrete layby and sidewalk connection to both Karen Dr and Barbara Dr intersections Construction starting May 2025
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Albro Lake Rd Before Chapman St (6020) 85 Albro Lake Rd North side of Albro Lake Rd adjacent Civic 85 Relocation of bus stop out of driveway at Civic 81 to boulevard in front of Civic 85, installation of concrete pad between sidewalk and curb, and sidewalk repairs Under construction starting May 5, 2025
Alderney Dr Before Patuo'Qn (2359) 11 Canal St 40m Southwest from the new Alderney Dr/Patuo'Qn intersection near 11 Canal St New stop, installation of concrete bus pad and signpost, installation new of multi-use path Construction starting April 2025
Bridge Terminal Bay 1 (7601) 24 Nantucket Ave North side of Bridge Terminal at Bay 1 within area where bus stops Brick resetting on terminal platform Pending 2025 construction
Bridge Terminal Bay 12 (7612) 24 Nantucket Ave South side of Bridge Terminal at Bay 12 within area where bus stops Concrete bay repairs Pending 2025 construction
Bridge Terminal Bay 14 (7614) 24 Nantucket Ave South side of Bridge Terminal at Bay 14 within area where bus stops Concrete bay repairs Pending 2025 construction
Bridge Terminal Bay 15 (7615) 24 Nantucket Ave South side of Bridge Terminal at Bay 15 within area where bus stops Concrete bay repairs, brick resetting on terminal platform Pending 2025 construction
Bridge Terminal Bay 16 (7616) 24 Nantucket Ave South side of Bridge Terminal at Bay 16 within area where bus stops Brick resetting on terminal platform Pending 2025 construction
Bridge Terminal Bay 2 (7602) 24 Nantucket Ave North side of Bridge Terminal at Bay 2 within area where bus stops Brick resetting on terminal platform Pending 2025 construction
Bridge Terminal Bay 8 (7608) 24 Nantucket Ave North side of Bridge Terminal at Bay 8 within area where bus stops Concrete bay repairs, brick resetting on terminal platform Pending 2025 construction
Bridge Terminal Bay 9 (7609) 24 Nantucket Ave South side of Bridge Terminal at Bay 9 within area where bus stops Concrete bay repairs, brick resetting on terminal platform Pending 2025 construction
Hudson Way Before Baffin Blvd (6083) Near the intersection of Hudson Way and Baffin Blvd West side of Hudson Way Installation of new concrete bus pad with opposing pedestrian ramps to provide pedestrian access to the existing sidewalk on opposite side of Hudson Way Construction starting May 2025
Pinecrest Dr After Albro Lake Rd (7449) 44 Pinecrest Dr North side of Pinecrest Dr Slight relocation of bus stop approximately 5 metres west, replacement of concrete bus pad and new signpost Pending 2025 construction
Pinecrest Dr After Primrose St (2355) 65 Primrose St North side of Pinecrest Dr, abutting Civic 65 Primrose New stop, installation of concrete bus pad and signpost Pending 2025 construction
Pinecrest Dr At Civic 103 (7452) 103 Pinecrest Dr East side of Pinecrest Dr at Civic 103 Installation of a backless bench Pending 2025 construction
Pinecrest Dr At Civic 63 (7456) 65 Pinecrest Dr South side of Pinecrest Dr Relocation of bus stop from 63 Pinecrest Dr to 65 Pinecrest Dr, new concrete bus pad and signpost Pending 2025 construction
Pinecrest Dr At Crystal Dr (7458) 85 Pinecrest Dr South side of Pinecrest Dr Removal of stop Pending 2025 construction
Pinecrest Dr Before Albro Lake Rd (7450) 169 Albro Lake Rd South side of Pinecrest Dr, abutting Civic 169 Albro Lake Rd Slight relocation of bus stop approximately 5 metres west, replacement of concrete bus pad and new signpost Pending 2025 construction
Pinecrest Dr Before Crystal Dr (7457) 78 Pinecrest Dr North side of Pinecrest Dr Removal of stop, Pinecrest Dr Before Crystal Dr (7457) and Pinecrest Dr Before Primrose St (7459) will be consolidated at new location Pinecrest Dr After Primrose St (2355) Pending 2025 construction
Pinecrest Dr Before Primrose St (7459) 72 Pinecrest Dr North side of Pinecrest Dr Removal of stop, Pinecrest Dr Before Crystal Dr (7457) and Pinecrest Dr Before Primrose St (7459) will be consolidated at new location Pinecrest Dr After Primrose St (2355) Pending 2025 construction
Primrose St Before Roberts Bruns Dr (2356) 16 Primrose St East side of Primrose St New stop replacing Robert Burns Dr After Primrose St (8177), installation of new concrete bus pad between curb and sidewalk Pending 2025 construction
Princess Margaret Blvd After Windmill Rd (8075) 463 Windmill Rd North side of Princess Margaret Blvd abutting Civic 463 Windmill Rd Installation of concrete bus pad, new abutting sidewalk connection from pad to the pedestrian ramp at the Windmill Rd intersection Construction starting May 2025
Princess Margaret Blvd At Civic 40 (8071) 40 Princess Margaret Blvd West side of Princess Margaret Blvd adjacent to Civic 40 Replacement of small asphalt pad with new standard size concrete bus pad between curb and walkway Construction starting May 2025
Princess Margaret Blvd At Civic 55 (8072) 55 Princess Margaret Blvd West side of Princess Margaret Blvd adjacent to Civic 55 Replacement of small concrete pad with new standard size concrete bus pad and pedestrian ramp to access opposite side of street, reinstallation of shelter Construction starting May 2025
Princess Margaret Blvd Before Windmill Rd (8078) 461 Windmill Rd South side of Princess Margaret Blvd abutting Civic 461 Windmill Rd Slight relocation of bus stop, new concrete bus pad between curb and sidewalk Construction starting May 2025
Robert Burns Dr After Primrose St (8177) 23 Primrose St North side of Robert Burns Dr Removal of stop, stop to be relocated to Primrose St Before Roberts Bruns Dr (2356) Pending 2025 construction
Thistle St After Beech St (8383) 74 Thistle St Southeast side of Thistle St abutting Civic 74 Concrete bus pad replacement Construction starting May 2025
Thistle St After Crichton Park Rd (8384) 2 Forest Rd North side of Thistle St near 2 Forest Rd Replacement of existing concrete bus pad and sidewalk repairs Construction starting May 2025
Thistle St After Mayflower St (8386) 98 Thistle St East side of Thistle St abutting Civic 98 Additional concrete at stop to increase bus pad length Construction starting May 2025
Thistle St Before Crichton Park Rd (8391) 3 Crichton Park Rd West side of Crichton Park Rd near Civic 3 Replacement of existing concrete bus pad and sidewalk repairs Construction starting May 2025
Thistle St Before Mayflower St (8388) 97 Thistle St West side of Thistle St abutting Civic 97 Replacement of existing concrete bus pad with a larger concrete pad Construction starting May 2025
Thistle St opposite Beech St (8390) Opposite to 28 Beech St North side of the Thistle St opposite to 28 Beech St Slight relocation of the stop to allow installation of a pedestrian ramp to cross to the sidewalk on opposite side of the road, installation of new standard concrete bus pad approximately 12 metres north of current location Construction starting May 2025
Woodside Ferry Terminal Bay 1 (8962) 9 Atlantic St South side of Woodside Ferry Terminal Bay 1 within area where bus stops Replacement of existing concrete platform, installation of tactile directional indicator plates and bay signage Pending 2025 Construction
Woodside Ferry Terminal Bay 2 (8964) 9 Atlantic St South side of Woodside Ferry Terminal Bay 2 within area where bus stops Replacement of existing concrete platform, installation of tactile directional indicator plates and bay signage Pending 2025 Construction
Woodside Ferry Terminal Bay 3 (8965) 9 Atlantic St South side of Woodside Ferry Terminal Bay 3 within area where bus stops Replacement of existing concrete platform, installation of tactile directional indicator plates and bay signage Pending 2025 Construction
Woodside Ferry Terminal Bay 4 (8966) 9 Atlantic St South side of Woodside Ferry Terminal Bay 4 within area where bus stops Replacement of existing concrete platform, installation of tactile directional indicator plates and bay signage Pending 2025 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Akerley Blvd Before Burnside Dr (6008) 121 Akerley Boulevard North side of Akerley Boulevard Installation of a concrete bus pad with connection to the multi-use path Construction starting May 2025
Collins Grv After Regal Rd (2255) 34 Regal Road North side of Collins Grove Installation of a concrete bus pad with signpost and a pedestrian ramp on the opposing side of the street to access the sidewalk Pending 2025 construction
Collins Grv At Civic 70 (2256) 70 Regal Road North side of Collins Grove Installation of a concrete bus pad and pedestrian ramp to access sidewalk on opposite side of the street Pending 2025 construction
Collins Grv Before Spring Ave (2257) 100 Regal Road Northeast side of Collins Grove Installation of a new concrete bus pad, signpost and opposing pedestrian ramps to access sidewalk on the opposite side of the street Pending 2025 construction
Commodore Dr Before John Savage (xxxx) 261 Commodore Drive North side of Commodore Drive Installation of a concrete bus pad between sidewalk and curb Pending 2025 construction
Dorothea Dr After Spring Ave (2258) 130 Dorothea Drive East side of Dorothea Drive Installation of a concrete bus pad between sidewalk and curb, sidewalk replacement Pending 2025 construction
Joseph Zatzman Dr Before Topple Dr (6989) 210 Joseph Zatzman Drive North side of Joseph Zatzman Drive Removal of stop, removal of concrete, sod restoration Pending 2025 construction
Marketplace Dr After Bancroft Ln Bay 3 (2034) 111 Marketplace Drive East side of Marketplace Drive Removal of stop, will be replaced by Wrights Cove Terminal Pending 2025 construction
Marketplace Dr Before Bancroft Ln Bay 4 (6014) Opposite to 111 Marketplace Drive West side of Marketplace Drive Removal of stop, will be replaced by Wrights Cove Terminal Pending 2025 construction
Mt Edward Rd After Lucien Dr (7266) 119 Mount Edward Road North side of Mount Edward Road Installation of concrete bus pad, concrete shelter pad and sidewalk connecting to Lucien Dr Pending 2025 construction
Spring Ave After Dorothea Dr (8326) 228 Spring Avenue East side of Spring Avenue Installation of a concrete bus pad, installation of new sidewalk connecting Dorothea Dr to Ellenvale Ave Pending 2025 construction
Spring Ave After Grandview Dr (2272) Opposite to 176 Spring Avenue West side of Spring Avenue Installation of a concrete bus pad between the curb and sidewalk Pending 2025 construction
Spring Ave Before Ellenvale Ave (8339) 282 Spring Avenue East side of Spring Avenue Installation of a concrete bus pad, installation of new sidewalk connecting Dorothea Dr to Ellenvale Ave Pending 2025 construction
Topple Dr At Civic 21 (8398) 21 Topple Drive West side of Topple Drive Removal of stop, removal of concrete, sod restoration Pending 2025 construction
Windmill Rd Before Wright Ave Bay 2 (8532) 645 Windmill Road West side of Windmill Road Slight relocation and replacement of concrete shelter pad Pending 2025 construction
Wrights Cove Terminal Bay 1 (2334) 111 Marketplace Drive East side of Marketplace Drive New stop at Wrights Cove Terminal, includes the installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd Pending 2025 construction
Wrights Cove Terminal Bay 2 (2335) 111 Marketplace Drive East side of Marketplace Drive New stop at Wrights Cove Terminal, includes the installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd Pending 2025 construction
Wrights Cove Terminal Bay 3 (2336) 111 Marketplace Drive East side of Marketplace Drive New stop at Wrights Cove Terminal, includes the installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd Pending 2025 construction
Wrights Cove Terminal Bay 4 (2337) 111 Marketplace Drive East side of Marketplace Drive New stop at Wrights Cove Terminal, includes the installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd Pending 2025 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Barrington St After Cogswell St Bay 3 (6105) 1990 Barrington St East side of Barrington St Concrete bus pad and sidewalk replacement, two new shelters and seven new benches Completed February 2025
Barrington St After Duke St Bay 1 (6087) 1903 Barrington St West side of Barrington St Concrete bus pad and sidewalk replacement, three new shelters Completed February 2025
Barrington St At Scotia Square Bay 4 (6108) 1930 Barrington St East side of Barrington St Concrete bus pad and sidewalk replacement, three new bus shelters and three new benches Completed February 2025
Barrington St Before Cogswell Bay 2 (2348) 1903 Barrington St West side of Barrington St Concrete bus pad and sidewalk replacement, three new shelters Completed February 2025
Barrington St Before Duke St Bay 5 (6107) 5201 Duke St East side of Barrington St Concrete bus pad and sidewalk replacement, four new shelters and eight new benches Completed February 2025
Lower Water St Before Bishop St (8819) 1475 Lower Water St East side of Lower Water St adjacent to Civic 1475 Relocation of bus stop approximately 9 metres to the south, installation of tactile warning surface indicator plates, concrete bus platform to cross bike lane from sidewalk Pending 2025 construction
Lower Water St Before Morris St (8866) 1233 Lower Water St East side of Lower Water St adjacent to Civic 1233 Installation of tactile warning surface indicator plates, concrete bus platform to cross bike lane from sidewalk Pending 2025 construction
Lower Water St Before Sackville St (8821) 1601 Lower Water St East side of Lower Water St adjacent to Civic 1601 Installation of tactile warning surface indicator plates, concrete bus platform to cross bike lane from sidewalk Pending 2025 construction
Lower Water St Before Salter St (9006) 1505 Lower Water St East side of Lower Water St adjacent to Civic 1505 Relocation of bus stop approximately 8 metres to the south, installation of tactile warning surface indicator plates, concrete bus platform to cross bike lane from sidewalk Pending 2025 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Barrington St Before Nora Bernard St (6104) 5221 Barrington St West side of Barrington St abutting Civic 5221 Relocation of stop, new concrete bus pad Pending 2025 construction
Barrington St Before Upper Water St (2346) 2021 Brunswick St West side of Barrington St New stop, new concrete pad Completed May 2025
Cogswell St Before Gottingen St (6455) Near 2003 Gottingen St North side of Cogswell St Slight relocation of the stop at the location of work, new shelter pad, Pending 2025 construction
Gottingen St Before Black St (6777) 2698 Gottingen St Soutwest side of Gottingen St New concrete bus pad at 2698 Gottingen St, bus stop being relocated to allow for installation of a new RRFB crosswalk Pending 2025 construction
Gottingen St Before Russell St (6783) Opposite to 3059 Gottingen St West side of Gottingen st Removal of the stop from service Pending 2025 construction
Northridge Rd Before Novalea Dr (2224) 5522 North Ridge Rd East side of North Ridge Rd adjacent to Civic 5522 Removal of concrete pad and signpost and reinsatating with sod Pending 2025 construction
Young St Before Isleville St (2354) No abutting Civic address East side of Young St New signpost, new bus stop to be in service from May 2025 Pending 2025 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Joseph Howe Dr After Clinton Ave (7006) 2669 Joseph Howe Dr West side of Joseph Howe Dr near Civic 2669 Slight relocation of bus stop with new concrete pad between curb and sidewalk Pending 2025 construction
Joseph Howe Dr After Scot St (2325) 3601 Joseph Howe Dr East side of Joseph Howe Dr near the Superstore New concrete pad between curb and sidewalk, new shelter pad and shelter behind the sidewalk Pending 2025 construction
Joseph Howe Dr Before Abbott Dr (6979) Opposite and North of 7165 Abbott Dr West side of Joseph Howe Dr south of Hwy 102 overpass New concrete shelter pad and shelter behind sidewalk Completed March 2025
Oxford St After North St (7411) 2619 Oxford St East side of Oxford St near Civic 2619 Reinstatement of concrete bus pad between curb and sidewalk Pending 2025 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Dutch Village Rd After Andrew St (2362) 3569 Dutch Village Rd East side of Dutch Village Rd New bus stop replacing Dutch Village Rd Before Rosedale Ave (6613) and Dutch Village Rd Before Sunnybrae Ave (6638), installation of concrete bus pad, new signpost, installation of tactile warning indicator plates adjacent to bike lane and sidewalk Pending construction 2025
Dutch Village Rd Before Andrew St (6609) 3543 Dutch Village Rd East side of Dutch Village Rd Removal of stop, stop being replaced by Dutch Village Rd After Andrew St (2362) Pending construction 2025
Dutch Village Rd Before Central Ave (2363) 3464 Dutch Village Rd West side of Dutch Village Rd New bus stop replacing Dutch Village Rd Before Andrew St (6609), installation of concrete bus pad, new signpost, installation of tactile warning indicator plates adjacent to bike lane and sidewalk Pending construction 2025
Dutch Village Rd Before Central Ave (6788) 3425 Dutch Village Rd East side of Dutch Village Rd Slight relocation, replacement of concrete bus pad, new signpost, installation of tactile warning indicator plates adjacent to bike lane and sidewalk Pending construction 2025
Dutch Village Rd Before Rosedale Ave (6613) 3534 Dutch Village Rd West side of Dutch Village Rd Removal of stop, stop being replaced by Dutch Village Rd Before Central Ave (2363) Starting May 2025
Dutch Village Rd Before Rufus Ave (6614) 3600 Dutch Village Rd West side of Dutch Village Rd Replacement of concrete bus pad, new sign post, installation of tactile warning indicator plates adjacent to bike lane and sidewalk Starting May 2025
Dutch Village Rd Before Sunnybrae Ave (6638) 3422 Dutch Village Rd West side of Dutch Village Rd Removal of stop, stop being replaced by Dutch Village Rd Before Central Ave (2363) Starting April 2025
Kearney Lake Rd After Hamshaw Dr (7021) 209 Kearney Lake Rd North of Kearney Lake Rd abutting civic 209 Relocation of bus stop to the east, installation of new concrete bus pad and bus layby, with connection to multi-use path Pending construction 2025
Lacewood Dr Before Willet St (7082) 4 Caxton Cl East side of Lacewood Dr Installation of new concrete bench pad adjacent to bus landing pad Pending construction 2025
Main Ave After Titus St (7166) 60 Main Ave East side of Main Ave Reinstatement of concrete bus pad and shelter Pending construction 2025
Willett St After Chadwick Pl (8488) 2 Chadwick Pl West side of Willet St Installing concrete to increase the size of the bus pad Pending construction 2025
Willett St After Coronation Ave (8490) Opposite 140 Coronation Ave West side of Willet St Installing concrete to increase the size of the bus pad Pending construction 2025
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Herring Cove Rd Before Dentith Rd (6853) 349 Herring Cove Rd South side of Herring Cove Rd near Civic 349 Removal of unused driveway, installation of curb, new concrete bus pad between sidewalk and curb Pending 2025 Construction
Herring Cove Rd Opposite Maplewood Dr (6910) 49 Herring Cove Rd North side of Herring Cove Rd opposite 49 Herring Cove Rd Relocation of bus stop signage approximately 16 metres east to allow for installation of new RRFB crosswalk Pending 2025 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Farnham Gate Rd Opposite Ross St (6647) 110 Farnham Gate South side of Farnham Gate adjacent Civic 110 New shelter on the bus pad Pending 2025 construction
Lacewood Dr After Startford Way (7064) 339 Lacewood Dr North side of Lacewood Dr near Civic 339 New shelter on the bus pad Pending 2025 construction
St Margarets Bay Rd After Raines Mill Rd (2328) 2 Raines Mill Rd North side of St Margarets Bay Rd abutting 2 Raines Mill Rd New bus stop with new concrete pad between curb and sidewalk, replacing bus stop St Margarets Bay Rd Before Raines Mill Rd (6180) Completed January 2025
St Margarets Bay Rd at civic 1917 (2330) 1917 St Margarets Bay Rd North side of St Margarets Bay Rd abutting Civic 1917 New bus stop with new concrete pad between the curb and the sidewalk, replacing bus stop St Margarets Bay Rd At Civic 1939 (6149) Starting May 2025
St Margarets Bay Rd Opposite Boylan Ln (6164) 1370 St Margarets Bay Rd South side of St Margarets Bay Rd abutting Civic 1370 New concrete bus pad and new sidewalk from Raines Mill Rd to Oliver St, connecting shelter pad to an accessible pedestrian route Completed January 2025
Washmill Lake Dr At Civic 303 (6717) 303 Washmill Lake Dr South side of Washmill Lake Dr adjacent to Civic 303 New shelter on the bus pad Pending 2025 construction
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
2353 Prospect Bay Rd Before Carpool Parking Lot (2353) No abutting civic address North side of Prospect Rd before the carpool parking lot New bus stop created, installation of signpost Post installed, stop will be active for use May 19, 2025
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Beaver Bank Rd After Welkin Dr (8755) 352 Beaver Bank Rd West side of Beaver Bank Rd opposite Civic 345 New signpost, concrete pad, and sidewalk connection to intersection at Welkin Dr Completed 2024
Beaver Bank Rd Before Welkin Dr (8713) 343 Beaver Bank Rd East side of Beaver Bank Rd near Civic 343 Relocation bus stop forward ~10m, concrete pad increase, installation of signpost Completed May 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Cobequid Rd After Hillside Ave (6435) 112 Cobequid Rd West side of Cobequid Rd in front of Civic 112 Removal of bus stop concrete bus pad, reinstating sod, new bus stop will be approximately 45 metres North before Hillside Ave, stop will be closed permanently after new stop is commissioned Pending 2025 construction
Cobequid Rd After Maple Grove Dr (6431) 450 Cobequid Rd West side of Cobequid Rd near Civic 450 Installation of new shelter on shelter pad behind multi-use path Pending 2025 construction
Cobequid Rd Before Hillside Ave (6442) 111 Cobequid Rd East side of Cobequid Rd at Civic 111 Relocation of the stop approximately 15 metres South, installation of a concrete bus pad and sidewalk, with a connection to a crosswalk to access the sidewalk on the opposite side of street Pending 2025 construction
Cobequid Rd Before Hillside Dr (2352) Opposite to 123 Cobequid Rd West side of Cobequid Rd opposite to Civic 123 New relocated stop replacing stop Cobequid Rd After Hillside Ave (6435), installation of concrete bus pad between curb and sidewalk, sidewalk repairs Pending 2025 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Charlotte Ln (6287) 587 Bedford Hwy East side of Bedford Hwy near Civic 587 Installation of new concrete curb and gutter, concrete bus pad, shelter with concrete shelter pad, and sidewalk connecting the bus stop to Charlotte Ln intersection Construction started May 2025
Bedford Hwy After Shaunslieve Dr (6234) 34 Shaunslieve Dr West side of Bedford Hwy near Civic 34 Shaunslieve Dr Replacement of existing concrete bus pad, sidewalk replacement connecting bus stop to Shaunslieve Dr intersection, new shelter pad and shelter Construction started May 2025
Southgate Dr Before McQuillan Ln (2358) 120 Southgate Dr East side of Southgate abutting Civic 120 New bus stop, installation of concrete bus pad between curb and sidewalk Pending 2025 construction
Dartmouth Rd After OBrine St (6554) 67 Dartmouth Rd South side of Dartmouth Rd near Civic 71 Slight relocation of bus stop to the location of work, new concrete pad between curb, sidewalk, and sign post Pending 2025 construction
West Bedford Park & Ride Passenger Pick Up 120 Innovation Dr East side of Innovation Dr near parking lot of Civic 120 New shelter installation Pending 2025 construction