Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Brooks Dr At East Preston Rec Centre (8929) 24 Brooks Dr West side of Brooks Dr abutting Civic 24 Slight relocation - New connection to multi-use path. Pending 2024 construction
Brooks Dr Opposite East Preston Rec Centre (8769) 11 Brooks Dr East side of Brooks Dr abutting Civic 11 Slight relocation - New pad. Pending 2024 construction
Cain St After Churchill Terr (6331) 15 Cain St and 2 Churchill Terr Northeast side of Cain St from Civic 15 to intersection of Churchill Terr New concrete pad, new sidewalk. Completed December 2023
Clarence St After Cain St (8506) 34 Clarence St Northwest side of Clarence St from Civic 34 to the intersection of Cain St New concrete pad, new sidewalk. Completed December 2023
Hwy 7 After Civic 1776 (8767) 1776 Hwy 7 East side of Hwy 7 abutting Civic 1776 Slight relocation - New pad. Pending 2024 construction
Hwy 7 After Upper Governor St (8930) 1977 Hwy 7 Northwest side of Hwy 7 abutting Civic 1977 New pad, new connection to multi-use path. Pending 2024 construction
Hwy 7 At Civic 1799 (8931) 1799 Hwy 7 West side of Hwy 7 abutting Civic 1799 Slight relocation - New connection to multi-use path. Pending 2024 construction
Hwy 7 Before Circle Dr (8918) 3293 Hwy 7 North side of Hwy 7 abutting Civic 3293 Widen gravel shoulder, new asphalt pad. Pending 2024 construction
Hwy 7 Before Lower Governor St (8768) 1 Lower Governor St Southeast side of Hwy 7 adjacent 1 Lower Governor St Slight relocation - New pad. Pending 2024 construction
Hwy 7 Before Martin Lake Dr (8920) 3103 Hwy 7 West side of Hwy 7 abutting Civic 3103 Widen gravel shoulder, new asphalt pad. Pending 2024 construction
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Caldwell Rd After Birchill Dr (2218) 1720 Birchill Dr North east side of Caldwell Rd abutting Civic 1720. Concrete landing pad and sidewalk connection to Birchill Dr. Pending 2024 construction
Caldwell Rd Before Deyoung Dr (2220) 1622 Caldwell Rd North east side of Caldwell Rd abutting Civic 1622. Concrete landing pad and sidewalk connection to Deyoung Dr. Pending 2024 construction
Caldwell Rd Opposite Kaleigh Dr (2219) 1682 Caldwell Rd North east side of Caldwell Rd abutting Civic 1682. Concrete landing pad with sidewalk connection to Kaleigh Dr. Pending 2024 construction
Collins Grv At Civic 83 (2268) 83 Collins Grv West side of Collins Grv abutting Civic 83 New concrete pad between curb and sidewalk. Pending 2024 construction
Collins Grv Before Collins Grove Rg (2269) 1 Collins Grove Rg South side of Collins Grv adjacent 1 Collins Grove Rg New concrete pad between curb and sidewalk. Pending 2024 construction
Cow Bay Rd Before Caldwell Rd (8674) 386 Cow Bay Rd North west side of Cow Bay Rd abutting Civic 386 Concrete landing pad and sidewalk connection to Caldwell Rd intersection. Pending 2024 construction
Heritage Hills Dr Before Cow Bay Rd (8673) 4 Heritage Hills Dr North east side of Heritage Hills Dr abutting Civic 4 Concrete landing pad and sidewalk connection to Cow Bay Rd. Pending 2024 construction
Heritage Hills Dr Before Serop Cr (8672) 1 Serop Cr North east side of Heritage Hills Dr adjacent 1 Serop Cr Concrete landing pad and sidewalk connection to Serop Cr. Pending 2024 construction
Lucien Dr After Dorothea Dr (2260) 85 Lucien Dr Northeast side of Lucien Dr abutting 85 Lucien Dr Relocating bus stop away from intersection. Installing new concrete between curb and sidewalk. Completed October 2023
Lucien before Whynette (2261) 58 Lucien Dr Northeast side of Lucien abutting 58 Lucien Dr New concrete pad between curb and sidewalk. Completed October 2023
Main Rd Before Bonaventure St (7486) No abutting Civic address Northwest side of Main Rd near Bonaventure St Shelter replacement. Completed January 2024
Portland Hills Terminal Bay 1 (8949) No abutting Civic address Portland Hills Terminal Shelter replacement. Completed November 2023
Portland Hills Terminal Bay 2 (8950) No abutting Civic address Portland Hills Terminal Shelter replacement. Pending 2024 construction
Portland Hills Terminal Bay 4 (8952) No abutting Civic address Portland Hills Terminal Shelter replacement. Completed November 2023
Portland Hills Terminal Bay 5 (8953) No abutting Civic address Portland Hills Terminal Shelter replacement. Completed November 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Ashgrove Ave After Cole Harbour Rd (6048) 1150 Cole Harbour Rd West side of Ashgrove Ave abutting 1150 Cole Harbour Rd Shelter replacement. Completed October 2023
Astral Dr After Willowdale Dr (6056) 31 Astral Dr South side of Astral Dr abutting Civic 31 New sidewalk. Completed October 2023
Astral Dr Before Spence Dr (6059) 1 Spence Dr South side of Astral Dr adjacent 1 Spence Dr New sidewalk. Completed October 2023
Circassion Dr After Ellerslie Cr (2307) 62 Circassion Cr East side of Circassion Dr abutting Civic 62 Relocation of bus stop Circassion Dr Before Ellerslie (6425) after Ellerslie Cr. New concrete pad between curb and sidewalk. Pending 2024 construction
Cole Harbour Rd After Armbro Ln (6475) 1108 Cole Harbour Rd South side of Cole Harbour Rd abutting Civic 1108 Shelter replacement. Completed December 2023
Cole Harbour Rd After Otago Dr (6478) 915 Cole Harbour Rd North side of Cole Harbour Rd abutting Civic 915 Shelter replacement. Completed October 2023
Cole Harbour Rd Before Dorothea Dr (6481) 907 Cole Harbour Rd North side of Cole Harbour Rd opposite Civic 912 Shelter replacement. Pending 2024 construction
Forest Hills Pky At Cole Harbour Place (6669) 51 Forest Hills Pky East side of Forest Hills Pky abutting Civic 51 New shelter. March 2024 construction
Karen Dr After Hillsboro Dr (7012) 19 Karen Dr North side Karen Dr abutting Civic 19 Discontinued stop - Remove concrete and post, reinstate sod. Completed August 2023
Main St After Cherry Brook Rd (6942) 10 Cherry Brook Rd North side of Main St abutting Civic 10 New shelter. Pending 2024 construction
Otago Dr After Poplar Dr (7399) 475 Poplar Dr West side of Otago Dr adjacent 475 Poplar Dr New concrete pad and sidewalk. Completed September 2023
Otago Dr Before Poplar Dr (7398) 29 Otago Dr East side of Otago Dr abutting Civic 29 New concrete pad. Completed September 2023
Pearl Dr Before Amethyst Cr (6061) 1 Amethyst Cres West side of Pearl Dr across from Civic 9 Discontinued stop - Remove concrete, reinstate sod. Completed September 2023
Sherwood St Opposite Woodbury Dr (8268) 70 Woodbury Dr South side of Sherwood St at Woodbury Dr and Sherwood St intersection Discontinued stop - Remove concrete, reinstate sod. Completed September 2023
Taranaki Dr After Greely Ct (8376) 238 Taranaki Dr East side of Taranaki Dr abutting Civic 238 Discontinued stop - Remove concrete and post, reinstate sod. Completed August 2023
Taranaki Dr After Karen Dr (8375) 171 Taranaki Dr North side of Taranaki Dr abutting Civic 171 Discontinued stop - Remove concrete and post, reinstate sod. Completed August 2023
Taranaki Dr At Civic 194 (8379) 194 Taranaki Dr East side of Taranaki Dr abutting Civic 194 Discontinued stop - Remove concrete and post, reinstate sod. Completed August 2023
Taranaki Dr Before Forest Hills Pky (8378) 289 Taranaki Dr North side of Taranaki Dr abutting Civic 289 Discontinued stop - Remove concrete and post, reinstate sod. Completed August 2023
Taranaki Dr Before Greely Ct (8377) 251 Taranaki Dr East side of Taranaki Dr abutting Civic 251 Discontinued stop - Remove concrete, reinstate sod. Completed August 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Crichton Ave Before Dahlia St (6535) No abutting address East side of Crichton Ave adjacent Sullivan's Pond Park Shelter replacement. Completed November 2023
Micmac Terminal Bay 1 (8171) 21 Micmac Blvd East side of Micmac Blvd abutting Civic 21 Shelter replacement. Completed November 2023
Micmac Terminal Bay 2 (8172) 21 Micmac Blvd East side of Micmac Blvd abutting Civic 21 Shelter replacement. Completed November 2023
Pleasant St Before Prince Arthur Ave (9007) 205 Pleasant St East sde of Pleasant St abutting Civic 205 Shelter replacement. Completed March 2024
Pleasant St Before Southdale St (7485) 181 Pleasant St East side of Pleasant St abutting Civic 181 Shelter replacement. Completed March 2024
Portland St After Gaston Rd (8038) 2 Nicole Ct East side of Portland St adjacent 2 Nicole Ct Shelter replacement. Completed March 2024
Sea King Dr After Ernest Ave (8264) 2 Sea King Dr South side of Sea King Dr abutting 2 Sea King Dr Relocation of stop towards Earnest Ave and installation of landing pad and sidewalk. Pending 2024 construction
Sea King Dr Before Lancaster Dr (8265) 34 Sea King Dr West Side of Lancaster Dr abutting 42 Sea King Dr Relocation of stop to Lancaster Dr and installation of concrete pad between curb and sidewalk. Pending 2024 construction
Sea King Dr After Lancaster Dr (8263) 35 Sea King Dr North Side of Sea King Dr adjacent to 35 Sea King Dr Installation of concrete pad between curb and sidewalk. Pending 2024 construction
Sea King Dr Before Ernest Ave (8266) 1 Sea King Dr Norh side of Sea King Dr abutting 1 Sea King Drive Installation of concrete pad between curb and sidewalk. Pending 2024 construction
Victoria Rd After Boland Rd (8419) 169 Victoria Rd South side of Victoria Rd abutting Civic 169 Shelter replacement. December 2023 construction
Windmill Rd Before Wyse Rd (7196) 53 Windmill Rd South side of Windmill Rd abutting Civic 55 Relocation of bus stop outside of driveway. Concrete pad between curb and sidewalk. Completed August 2023
Windmill Rd Opposite Pelzant St (8542) No abutting address West side of Windmill Rd adjacent DND Shelter replacement. Pending 2024 construction
Windmill Rd Opposite Wallace St (8546) 269 Windmill Rd West side of Windill Rd abutting Civic 269 Shelter replacement. Pending 2024 construction
Woodland Ave After Slayter St (2306) 18 Woodland Ave East side of Woodland Ave abutting Civic 18 Relocation of bus stop Woodland Ave Before Slayter St (8587). Concrete pad between curb and sidewalk. Pending 2024 construction
Woodland Ave Before Slayter St (2305) 19 Woodland Ave West side of Woodland Ave abutting Civic 19 Relocation of bus stop Woodland Ave After Slayter St (8585). Concrete pad between curb and sidewalk. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Braemar Dr Before Creelman Dr (6312) 177 Braemar Dr West side of Braemar Dr adjacent Lake Micmac New concrete shelter pad. Pending 2024 construction
Commodore Dr After Countryview Dr (8853) 9 Commodore Dr North side of Commodore Dr abutting Civic 9. New shelter. Pending 2024 construction
Countryview Dr Before Shubie Dr (6797) 32 Foulis Row East side of Countryview Dr adjacent 32 Foulis Row. New shelter. Pending 2024 construction
Cutler Ave After Civic 645 (2280) Civic 245 East side of Cutler Ave abutting Civic 245 New concrete pad between curb and sidewalk. Completed October 2023
Cutler Ave After Higney Ave (2282) Civic 305 East side of Cutler Ave abutting Civic 305 New concrete pad and sidewalk. Completed October 2023
Cutler Ave After Higney Ave (2294) 306 Higney Ave West side of Cutler Ave adjacent 306 Higney Ave New concrete pad between curb and sidewalk. Completed October 2023
Cutler Ave After Jim Connors Ave (2281) Civic 433 East side of Cutler Ave before Civic 433 New concrete pad and sidewalk. Completed October 2023
Cutler Ave At Civic 89 (2283) Civic 89 West side of Cutler Ave abutting Civic 89 New concrete pad and sidewalk. Completed October 2023
Cutler Ave At Civic 90 (2293) Civic 90 East side of Cutler Ave abutting Civic 90 New concrete pad between curb and sidewalk. Completed October 2023
Cutler Ave Before Civic 680 (2296) Civic 680 West side of Cutler Ave before Civic 680 New shelter. March 2024 construction
Cutler Ave Before Jim Connors (2295) Civic 464 West side of Cutler Ave abutting Civic 464 New concrete pad between curb and sidewalk. Completed October 2023
Hudson Way At Civic 10 (2297) Civic 10 East side of Hudson Way abutting Civic 10 New concrete pad between curb and sidewalk. Completed October 2023
Hudson Way Before Baffin Blvd (6083) No adjacent address West side of Hudson Way opposite Baffin Blvd New concrete pad and sidewalk. New RA-4 crosswalk. Pending 2024 construction
Hudson Way Before Princess Margaret Blvd (2298) Civic 320 East side of Hudson Way abutting Civic 320 New concrete pad between curb and sidewalk. Completed October 2023
Ilsley Ave At Civic 121 (6958) 121 Ilsley Ave East side of Ilsley Ave abutting Civic 121 New concrete pad and sidewalk. Pending 2024 construction
Ilsley Ave Before MacDonald Ave (6959) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and sidewalk. Pending 2024 construction
Ilsley Ave Opposite Halifax Transit (6949) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and sidewalk. Pending 2024 construction
Jennett Ave After Guildford Ave (2289) 165 Jennett Ave South side of Jennett Ave before Civic 165 New concrete pad between curb and sidewalk. Completed October 2023
Jennett Ave After John Savage Ave (2288) 133 John Savage Ave South side of Jennett Ave adjacent 133 John Savage Ave New concrete pad between curb and sidewalk. Completed October 2023
Jennett Ave Before Wilkinson Ave (2290) 240 Jennett Ave South side of Jennett Ave after Civic 2290 New concrete pad between curb and sidewalk. Completed October 2023
John Savage Ave After Wright Ave (2287) 183 John Savage Ave East side of John Savage Ave abutting Civic 183 New concrete pad between curb and sidewalk. Completed October 2023
Leaman Dr Before Ambercrest Pl (2251) 24 Leaman Dr East side of Leaman Drive between Civic 24 and Ambercrest Pl. New concrete pad and sidewalk. Pending 2024 construction
Marketplace Dr After Bancroft Ln (2034) 100 Marketplace Dr East side of Marketplace Dr opposite Civic 100 Slight relocation - new concrete pad between curb and sidewalk. Remove old concrete and reinstate sod. Completed August 2023
Princess Margaret Blvd After Windmill Rd (8075) 463 Windmill Rd North side of Princess Margaret Blvd abutting 463 Windmill Rd New concrete pad and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Hudson Way (8076) 465 Princess Margaret Blvd North side of Princess Margaret Blvd abutting Civic 465 New concrete pad and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Windmill Rd (8078) 461 Windmill Rd South side of Princess Margaret Blvd abutting 461 Windmill Rd New concrete pad between curb and sidewalk. Pending 2024 construction
Ronald Smith Ave After Ilsley Ave (8241) 121 Ilsley Ave South side of Ronald Smith Ave adjacent 121 Ilsley Ave New concrete pad between curb and sidewalk. Pending 2024 construction
Wilkinson Ave After Cutler Ave (2284) 670 Wilkinson Ave West side of Wilkinson Ave abutting Civic 670 New concrete pad between curb and sidewalk. Completed October 2023
Wilkinson Ave After Jennett Ave (2286) 18 Higney Ave West side of Wilkinson Ave opposite 18 Higney Ave New concrete pad between curb and sidewalk. Completed October 2023
Wilkinson Ave At Civic 795 (2291) 795 Wilkinson Ave East side of Wilkinson Ave abutting Civic 795 New concrete pad between curb and sidewalk. Completed October 2023
Wilkinson Ave Before Cutler Ave (2292) 635 and 673 Wilkinson Ave East side of Wilkinson Ave abutting Civics 635 and 673 New concrete pad between curb and sidewalk. Completed October 2023
Wilkinson Ave Opposite Civic 763 (2285) 763 Wilkinson Ave West side of Wilkinson Ave opposite Civic 763 New concrete pad between curb and sidewalk. Completed October 2023
Windmill Rd After Akerley Blvd (8533) 743 Windmill Rd South side of Windmill Rd adjacent Civic 743 New concrete shelter pad and shelter. Completed March 2024
Windmill Rd After Civic 520 (8535) 520 Windmill Rd West side of Windmill Rd across Civic 520 Slight relocation - new concrete pad and new sidewalk with pedestrian ramp. Completed October 2023
Windmill Rd Before Dawn Dr (8522) 696 Windmill Rd West side of Windmill Rd abutting Civic 696 Shelter replacement. Completed January 2024
Windmill Rd Before Wright Ave (8532) 645 Windmill Rd West side of Windmill Rd near Civic 645 Slight relocation - new concrete pad between curb and sidewalk, new concrete shelter pad. Remove old concrete and reinstate sod Completed August 2023
Woodlawn Rd After Mt Edward Rd (8590) 54 Woodlawn Rd Northwest side of Woodlawn Rd abutting Civic 54 Slight relocation - new concrete pad between curb and sidewalk. Remove old concrete and reinstate sod. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Hollis St After Barrington St (6938) 1145 Barrington St South side of Hollis St abutting 1145 Barrington St New concrete pad between curb and sidewalk. Completed August 2023
Lemarchant St Before University Ave (7144) 6136 University Ave East side of LeMarchant St adjacent 6136 University Ave Shelter replacement. Completed November 2023
Lower Water St Before Sackville St (8821) 1601 Lower Water St East Side of Lower Water Street abutting Civic 1601 New concrete pad between curb and sidewalk, relocate planter to area just past bus stop (north). Completed June 2023
Spring Garden Rd After South Park St (8322) Public Gardens North side of Spring Garden Rd adjacent The Public Gardens Slight relocation - concrete pad extension for shelter. Completed June 2023
Summer St After Veterans Memorial Ln (2304) 1747 Summer St East side of Summer St abutting 1747 Summer St Concrete pad repair and concrete shelter pad. Completed June 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Duffus St After Novalea Dr (6583) 5521/5515 Duffus St North side of Duffus St abutting Civic 5521/5515 Shelter replacement. Pending 2024 construction
Duffus St At Agricola St (6585) 5691 Agricola St North west side of Agricola St abutting Civic 5691 Slight relocation. New concrete pad between curb and sidewalk. Completed November 2023
Gottingen St After Young St (6770) No abutting address West side of Gottingen St adject park Shelter replacement. Completed December 2023
Kencrest Ave Before Glebe St (7050) 3749 Kencrest Ave South side of Kencrest Ave across Civic 3749 Remove existing shelter pad replace existing concrete pad behind sidewalk. Shelter to be temporarily removed. Completed September 2023
North St Before Windsor St (7357) 2590 Windsor St South east side of North St adjacent 2590 Windsor St Shelter replacement. Completed November 2023
Oxford St Before Berlin St (7405) 2733 and 2745 Oxford St East side of Oxford St in between Civics 2733 and 2745 New concrete pad between curb and sidewalk. Pending 2024 construction
Robie St Before Cabot St (8203) 3468 Robie St South west side of Robie St abutting Civic 3468 Shelter replacement. Pending 2024 construction
Windsor St After Connaught Ave (8551) 3628 Windsor St South side of Windsor St abutting Civc 3628 Concrete pad extension. Pending 2024 construction
Windsor St Before Maxwell Ave (8565) 3380 Windsor St South side of Windsor St abutting Civc 3380 Slight relocation. New concrete pad between curb and sidewalk. Pending 2024 construction
Windsor St Opposite London St (8572) 2901 Windsor St North west side of Windsor St abutting Civic 2901 Shelter replacement. Pending 2024 construction
Young St After Monaghan Dr (8629) 6141 Young St North west side of Young St abutting Civic 6141 Shelter replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Herring Cove Rd Before Melwood Ave (6900) No abutting address South east side of Herring Cove Rd south of Melwood Ave Shelter replacement. Completed March 2024
Joseph Howe Dr Before Abbott Dr (6979) Opposite 7165 Abbott Dr West side of Joseph Howe Dr opposite 7165 Abbott Dr New shelter pad and shelter. Pending 2024 construction
Joseph Howe Dr Before Dutch Village Rd (6984) 3627 Joseph Howe Dr East side of Joseph Howe Dr abutting Civic 3627 Shelter replacement. Completed November 2023
Kelly St After Halef Ct (2300) 2 Halef Ct East side of Kelly St adjacent 2 Halef Ct Consolidation of Alton Dr After Kelly St (8815) and Kelly St Before Halef Ct (9074). New concrete pad between curb and sidewalk. Completed June 2023
Mumford Rd Opposite Hemlock St (7279) No abutting address South side of Mumford Rd abutting cemetary Shelter replacement. Completed March 2024
Osborne St Before Sunset Ave (7396) 28 Sunset Ave South east side of Osborne St adjacent 28 Sunset Ave Shelter replacement. Completed November 2023
Oxford St After Quinpool Rd (7412) 6408 Quinpool Rd West side of Oxford St adjacent 6408 Quinpool Rd Shelter replacement. Completed November 2023
Oxford St Before Jubilee Rd (2308) 1750/1752 Oxford St West side of Oxford St abutting Civics 1750 and 1752 Consolidation of Oxford St After Jubilee Rd (7409) and Oxford St Before Norwood St (7419). New concrete pad between curb and sidewalk. Completed June 2023
Purcells Cove Rd After Dingle Rd (8118) 1452 Purcells Cove Rd West side of Purcells Cove Rd abutting Civic 1452 Shelter replacement. Pending 2024 construction
Purcells Cove Rd After Sailboat Ln (8122) No abutting address North side of Purcells Cove Rd near Reserve Rd Shelter replacement. Pending 2024 construction
Purcells Cove Rd Before Westgate Dr (8116) 34 Westgate Dr North east side of Purcells Cove Rd adjacent 34 Westgate Dr Shelter replacement. Pending 2023 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Flamingo Dr (6251) 188/190 Bedford Hwy Southwest side of Bedford Hwy abutting Civics 188 and 190 Shelter replacement. Completed December 2023
Bedford Hwy After Torrington Dr (6279) 2 Torrington Dr South side of Bedford Hwy adjacent 2 Torrington Dr Shelter replacement. Pending 2024 construction
Flamingo Dr After Dipper Cres (2302) 114 and 116 Flamingo Dr Southwest side of Flamingo Dr abutting Civic 114/116 New concrete pad between curb and sidewalk. Completed August 2023
Flamingo Dr After Dove St (2303) 61 Flamingo Dr West side of Flamingo Dr abutting Civic 61 Relocation of Flamingo Dr Before Dove St (6701). New bus pad, new sidewalk. Completed August 2023
Flamingo Dr After Meadowlark Cr (6706) DJ Butler Park North side of Flamingo Dr abutting DJ Butler Park New concrete pad and sidewalk. Completed August 2023
Flamingo Dr After Nightingale Dr (6698) 2 Nightingale Dr East side of Flamingo Dr abutting 2 Nightingale Dr New concrete pad and sidewalk. Completed August 2023
Flamingo Dr After Nightingale Dr (6699) 110 Flamingo Dr Southwest side of Flamingo Dr abutting Civic 110 Discontinued stop - remove concrete, reinstate sod. Completed August 2023
Flamingo Dr Before Dove St (6701) 57 Flamingo Dr West side of Flamingo Dr abutting Civic 57 Discontinued stop - remove concrete, reinstate sod. Completed August 2023
Flamingo Dr Before Meadowlark Cr (6702) 96 Flamingo Dr South side of Flamingo Dr abutting Civic 96 Slight relocation. New concrete pad between curb and sidewalk. Completed August 2023
Lacewood Dr Before Willett St (6660) 287 Lacewood Dr North side of Lacewood Dr abutting Civic 287 New park bench. Completed October 2023
Main Ave After Hillcrest St (7164) 176 Main Ave South side of Main Ave abutting Civic 176 New concrete pad and sidewalk. Completed September 2023
Main Ave After Maple St (7165) 80 Main Ave South side of Main Ave abutting Civic 80 New park bench. Completed October 2023
Main Ave At Flint St (7167) 103 Main Ave North side of Main Ave abutting Civic 103 New park bench. Completed October 2023
Main Ave Before Borden St (7168) 17 Skeena St and 18 Borden St South side of Main Ave between 17 Skeena St and 18 Borden St Extend concrete pad. Completed October 2023
Main Ave Before Dunbrack St (2009) 245 Main Ave North side of Main Ave abutting Civic 245 New park bench. Completed October 2023
Willett St Before Adelaide Ave (8498) 104 Adelaide Ave East side of Willett St adjacent 104 Adelaide Ave Discontinued stop - remove concrete, reinstate sod. Completed September 2023
Willett St Before Frederick Ave (8500) 123 Rosedale Ave East side of Willett St adjacent side yard of 123 Rosedale Ave Discontinued stop - remove concrete, reinstate sod. Completed September 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Ketch Harbour Rd After Latter Pond Ln (7056) 69 Ketch Harbour Rd West side of Ketch Harbour Rd abutting Civic 69 Move bus stop forward approximately 10 meters, install post and ashpalt pad. Completed August 2023
Old Sambro Rd At Civic 143 (7392) 143 Old Sambro Rd West side of Old Sambro Rd abutting Civic 143 Relocation of bus stop outside of driveway past the utility pole. New asphalt pad. Completed August 2023
Purcells Cove Rd Before Rocklyn Rd (8115) 2636 Purcells Cove Rd West side of Purcells Cove Rd abutting Civic 2636 Shelter replacement. Completed November 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Chain Lake Dr At Civic 209 (6394) 209 Chain Lake Dr West Side of Chain Lake Dr abutting Civic 209 Concrete pad extension. Pending 2024 construction
Julius Blvd After Susie Lake Cr (2314) 265 Julius Blvd Southeast side of Julius Blvd adjacent Civic 265 New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Chain Lake Dr (2316) 201 Chain Lake Dr South side of Julius Blvd abutting 201 Chain Lake Dr New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Dugger McNeil Dr (2315) 125 Julius Blvd South side of Julius Blvd adjacent Civic 125 New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Dugger McNeil Dr (2317) 82 Julius Blvd North side of Julius Blvd adjacent Civic 85 New concrete pad between curb and multi-use path. Pending 2024 construction
Julius Blvd Before Susie Lake Dr (2318) 265 Julius Blvd Northeast side of Julius Blvd opposite Civic 265 New concrete pad between curb and multi-use path. Pending 2024 construction
St Margarets Bay Rd After Clearwater Dr (6175) 1 Devonshire Dr North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd Intersection New concrete pad and pedestrian ramp to intersection. Pending 2024 construction
St Margarets Bay Rd Before Sheppards Run (6157) 438 Sheppards Run South side of St Margarets Bay Rd adjacent 438 Sheppards Run Shelter replacement. March 2024 construction
Susie Lake Cr After Hobsons Lake Dr (2311) 265 Susie Lake Cr North side of Susie Lake Cr abutting Civic 265 New concrete pad between curb and sidewalk. Completed October 2023
Susie Lake Cr After Julius Blvd (2319) 420 Susie Lake Cr South side of Susie Lake Cr abutting Civic 420 New concrete pad between curb and multi-use path. Completed October 2023
Susie Lake Cr At Civic 300 (2320) 300 Susie Lake Cr South side of Susie Lake Cr adjacent Civic 300 New concrete pad between curb and multi-use path. Completed October 2023
Susie Lake Cr Before Civic 420 (2312) 300 Susie Lake Cr North side of Susie Lake Cr opposite Civic 300 New concrete pad between curb and sidewalk. Completed October 2023
Susie Lake Cr Before Hobsons Lake Dr (2321) 265 Susie Lake Cr South side of Susie Lake Cr opposite Civic 265 New concrete pad between curb and multi-use path. Completed October 2023
Susie Lake Cr Before Julius Blvd (2313) 420 Susie Lake Cr North side of Susie Lake Cr opposite Civic 420 New concrete pad between curb and sidewalk. New concrete shelter pad and shelter. Completed March 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Beaver Bank Rd Before Grove Ave (8751) 840 Beaver Bank Rd East side of Beaver Bank Rd abutting Civic 840 New concrete pad between curb and sidewalk. Completed November 2023
Beaver Bank Rd Before Kinsac Rd (2123) 1581 Beaver Bank Rd West side of Beaver Bank Rd before Kinsac Rd Extend existing asphalt pad forward. Completed November 2023
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Cobequid Rd After Freer Ln (6434) No abutting address East side of Cobequid Dr adjacent park Shelter replacement. Completed December 2023
Cobequid Rd After Park Ave (6433) 2 Park Ave East side of Cobequid Dr adjacent 2 Park Ave Shelter replacement. Completed December 2023
Cobequid Rd Before Glendale Dr (6438) 220 Cobequid Rd North side of Cobequid Rd abutting Civic 220 Slight relocation - new concrete pad between curb and sidewalk. Completed June 2023
Downsview Plaza Before Sackville Dr (6579) 730 Sackville Dr Southwest side of Sackville Dr near Downsview Plaza Shelter replacement. Completed November 2023
Glendale Dr Before Cobequid Rd (6750) 216 Cobequid Rd West side of Glendale Dr abutting Civic 216 New sidewalk connection to intersection. Completed August 2023
Old Sackville Rd After Madeline Ave (2041) 455 Old Sackville Rd North side of Old Sackville Rd abutting Civic 455 Repair gravel washout under existing concrete pad. Completed June 2023
Old Sackville Rd Before Walker Ave (2043) 599 Old Sackville Rd Northeast side of Old Sackville Rd abutting Civic 589 Requires asphalt to prevent wash out. Completed June 2023
Sackville Dr At Civic 614 (7309) 614 Sackville Dr Southwest Side of Sackville Dr abutting Civic 614 Discontinued stop - remove concrete, reinstate sod. Completed June 2023
Sackville Dr At Civic 622 (2275) 622 Sackville Dr Southwest Side of Sackville Dr abutting Civic 622 New concrete pad between curb and sidewalk. Completed June 2023
Sackville Dr Before Armoyan Dr (7313) 300 Sackville Dr South side of Sackville Dr abutting 300 Sackville Dr Shelter replacement. Pending 2024 construction
Sackville Drive Before Leaside Drive (7325) 533 Sackville Dr Northeast side of Sackville Dr abutting Civic 533 New concrete pad between curb and sidewalk. Completed June 2023
Sackville Terminal Bay 2 (8967) Sackville Terminal Sackville Terminal Shelter replacement. Completed November 2023
Sackville Terminal Bay 3 (8959) Sackville Terminal Sackville Terminal Shelter replacement. Completed November 2023
Sackville Terminal Bay 4 (8960) Sackville Terminal Sackville Terminal Shelter replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Nelsons Landing Blvd (6259) 7 Nelsons Landing Blvd North side of Bedford Hwy oppposite 7 Nelsons Landing Blvd New shelter pad and shelter. Pending 2024 construction
Bedford Hwy Before Spring St (6249) 1326 Bedford Hwy Northwest side of Bedford Hwy abutting Civic 1326 Shelter replacement. Pending 2024 construction
Bedford Hwy Before Union St (6228) 1488 Bedford Hwy North side of Bedford Hwy abutting Civic 1488 Shelter replacement. Completed January 2024
Bedford Hwy Opposite Fourth St (6283) 1225 Bedford Hwy East side of Bedford Hwy abutting Civic 1225 New concrete pad between curb and sidewalk. Completed June 2023
Broad St Before Larry Uteck Blvd (2027) 51 Jam Ln North side of Broad St adjacent 51 Jam Ln New concrete shelter pad and shelter. November 2023 construction
Larry Uteck Blvd After Bluewater Rd (7026) 380 Bluewater Rd South side of Larry Uteck Blvd abutting 380 Bluewater Rd New concrete pad between curb and sidewalk. Completed September 2023
Larry Uteck Blvd After Brookline Dr (2310) No abutting address Southwest side of Larry Uteck Blvd near roundabout New concrete pad between curb and sidewalk. Completed September 2023
Larry Uteck Blvd After Kearney Lake Rd (6298) 1000 Larry Uteck Blvd South side of Larry Uteck Blvd abutting 1000 Larry Uteck Blvd New concrete pad, sidewalk connection, and RA-5 crosswalk. New concrete shelter pad and shelter. Completed January 2024
Larry Uteck Blvd Before Abbington Ave (7022) 29 Abbington Ave Northeast side of Larry Uteck Blvd adjacent 29 Abbington Ave New concrete pad, sidewalk connection, and RA-5 crosswalk. Pending 2024 construction
Larry Uteck Blvd Before Belle St (7027) 3 Belle St Southwest side of Larry Uteck Blvd adjacent 3 Belle St New concrete pad, sidewalk connection, and RA-5 crosswalk. Pending 2024 construction
Larry Uteck Blvd Before Bluewater Rd (7014) 380 Bluewater Rd North side of Larry Uteck Blvd across from 380 Bluewater Rd New concrete pad between curb and new multi-use path. Completed September 2023
Larry Uteck Blvd Before Broad St (2309) No abutting address Northeast side of Larry Uteck Blvd near roundabout New concrete pad between curb and new multi-use path. Completed September 2023