Traffic Delay - Briarwood Crescent and Briar Place

Posted:

EN
FR

Le texte en français suit.

Location: Briarwood Crescent from Lacewood Drive to Bayview Road, and Briar Place from Briarwood Crescent to the end

Date: Sunday, November 26

Time: 7 a.m. until 6 p.m.

Work details: This work is for pavement maintenance, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.   

Traffic impact: Lane drops will be in place while work is underway. Local street access will be maintained. Motorists should expect delays and are advised to use alternative routes whenever possible. 

***********************************************************************************************

Ralentissement de la circulation – Croissant Briarwood et place Briar

Lieu: Croissant Briarwood, de la promenade Lacewood au chemin Bayview, et la place Briar, du croissant Briarwood jusqu’à la fin

Date: dimanche 26 novembre

Heure: De 7 h à 18 h

Détails des travaux: Ces travaux visent à faciliter la réparation de l’asphalte, qui appuient le Plan des priorités stratégiques du Conseil régional de 2021-2025 visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Impact sur la circulation: Des fermetures de voie avec une circulation intermittente occasionnelle seront en place pendant que les travaux sont en cours. L’accès à la rue locale sera maintenu. Les automobilistes doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.