Posted:
Le texte en français suit.
Location: Parkland Drive, between Lancaster Drive and Bethany Way
Date: Thursday, Sept. 16
Time: 9 a.m. to 4 p.m.
Work Details: Installing natural gas service connection at 210 Parkland Drive.
Traffic Impact: The sidewalk will be closed during work, but two-way traffic will be maintained.
Construction during COVID-19: Construction crews will strive to maintain physical distancing measures, however, residents may see workers within two metres of each other while completing certain tasks which aligns with the exemptions outlined in the Provincial Health Order. If approaching construction crews, residents are asked to maintain at least two metres of physical distancing.
**************************************************************************************************
Emplacement : Promenade Parkland, entre la promenade Lancaster et le chemin Bethany
Date : Le jeudi 16 septembre
Heure : De 9 h à 16 h
Détails des travaux : Installation d’une conduite de gaz naturel au 210, promenade Parkland.
Impact sur la circulation : Le trottoir sera fermé pendant les travaux, mais la circulation dans les deux sens sera maintenue.
Construction pendant la COVID-19 : Les équipes de construction s’efforceront de maintenir des mesures de distanciation physique, mais les résidents peuvent voir des travailleurs à moins de deux mètres l’un de l’autre tout en accomplissant certaines tâches qui correspondent aux exemptions prévues dans le décret provincial sur la santé. S’ils s’approchent des équipes de construction, les résidents sont priés de prévoir une distanciation physique d’au moins deux mètres.