Trunk 2 (Fall River) – Road Construction

Posted:

EN

Friday, September 9, 2016 (Halifax, NS) – The Halifax Regional Municipality is advising residents and motorists that road construction begins today on Trunk 2 (Fall River) from Holland Road to Collins Drive and continues on Saturday and Sunday.

Today’s work is scheduled from 9 a.m. to 4 p.m. Crews will be on site from 8 a.m. to 7 p.m. on Saturday and 9 a.m. to 7 p.m. on Sunday.

There will be stop-and-go traffic during this time. Motorists should expect long delays in the area and are asked to use alternative routes whenever possible. The municipality regrets any inconvenience this work may cause.

-30-