Traffic Delay – First Lake Drive

Posted:

EN
FR

Le texte en français suit.

Location: First Lake Drive, from Crimson Drive to Cobequid Road

Date: Friday, Oct. 10

Time: 12:30 to 2 p.m.

Work details: This work includes road repair in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop-and-go traffic control will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

****************************************************************************************************************************************

Ralentissement de la circulation – First Lake Drive

Lieu: First Lake Drive, de Crimson Drive au Cobequid Road

Date: Vendredi 10 octobre

Heure: De 12 h 30 à 14 h

Description des travaux: Ces travaux comprennent des réparations de l’asphalte et sont réalisés à l’appui du Plan des priorités stratégiques du Conseil régional de 2021-2025 (en anglais) visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Répercussion sur la circulation: Des mesures de contrôle de la circulation seront en place durant les travaux. Les conducteurs doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.